流线平衡问题:综述

Olga Battaia, X. Delorme, A. Dolgui, Grimaud Frederic, B. Finel
{"title":"流线平衡问题:综述","authors":"Olga Battaia, X. Delorme, A. Dolgui, Grimaud Frederic, B. Finel","doi":"10.1109/IESM.2015.7380287","DOIUrl":null,"url":null,"abstract":"Flow lines are widely used in mechanical industry. They consist to a set of workstations through which parts are manufactured. Designing such a line is a very complex problem due to manufacturing and design constraints and to the large number of possible decisions. Usually, the design of this type of production lines involves the selection of the necessary operations (indivisible units of work) to machine a part, the configuration design, the line scheduling. In this paper we present a survey of flow lines balancing problem, their approach and formulation and some solutions to optimize them studied in the literature. A special attention is paid for the assembly lines balancing problems.","PeriodicalId":308675,"journal":{"name":"2015 International Conference on Industrial Engineering and Systems Management (IESM)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Flow line balancing problem: A survey\",\"authors\":\"Olga Battaia, X. Delorme, A. Dolgui, Grimaud Frederic, B. Finel\",\"doi\":\"10.1109/IESM.2015.7380287\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Flow lines are widely used in mechanical industry. They consist to a set of workstations through which parts are manufactured. Designing such a line is a very complex problem due to manufacturing and design constraints and to the large number of possible decisions. Usually, the design of this type of production lines involves the selection of the necessary operations (indivisible units of work) to machine a part, the configuration design, the line scheduling. In this paper we present a survey of flow lines balancing problem, their approach and formulation and some solutions to optimize them studied in the literature. A special attention is paid for the assembly lines balancing problems.\",\"PeriodicalId\":308675,\"journal\":{\"name\":\"2015 International Conference on Industrial Engineering and Systems Management (IESM)\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-10-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Industrial Engineering and Systems Management (IESM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IESM.2015.7380287\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Industrial Engineering and Systems Management (IESM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IESM.2015.7380287","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

流线在机械工业中应用广泛。它们由一组工作站组成,通过这些工作站制造零件。由于制造和设计的限制以及大量可能的决策,设计这样一条生产线是一个非常复杂的问题。通常,这类生产线的设计涉及加工零件的必要操作(不可分割的工作单元)的选择,配置设计,生产线调度。本文综述了流线平衡问题的研究现状,介绍了流线平衡问题的处理方法和公式,并给出了一些优化流线平衡问题的方法。对装配线的平衡问题给予了特别的关注。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Flow line balancing problem: A survey
Flow lines are widely used in mechanical industry. They consist to a set of workstations through which parts are manufactured. Designing such a line is a very complex problem due to manufacturing and design constraints and to the large number of possible decisions. Usually, the design of this type of production lines involves the selection of the necessary operations (indivisible units of work) to machine a part, the configuration design, the line scheduling. In this paper we present a survey of flow lines balancing problem, their approach and formulation and some solutions to optimize them studied in the literature. A special attention is paid for the assembly lines balancing problems.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信