具有次要截止日期的调度计算算法,以最小化惩罚

C. Han, Kwei-Jay Lin
{"title":"具有次要截止日期的调度计算算法,以最小化惩罚","authors":"C. Han, Kwei-Jay Lin","doi":"10.1109/EMWRTS.1994.336851","DOIUrl":null,"url":null,"abstract":"In many real-time applications, some job allows part of its computation to be executed after its primary deadline but before an extended, or secondary deadline. We study the scheduling issues for real-time computations with secondary deadlines. We call the part of a computation which must be completed before the primary deadline its hard part, and the rest its soft part. The soft part of a computation can be delayed after its primary deadline but must be finished before its secondary deadline. Although the computations have secondary deadlines, it is still desirable to finish the complete computations before their primary deadlines. Therefore, the system receives a penalty for each soft part that finishes after the primary deadline. We present scheduling algorithms for the model which minimizes the total penalty or the maximum penalty.<<ETX>>","PeriodicalId":322579,"journal":{"name":"Proceedings Sixth Euromicro Workshop on Real-Time Systems","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1994-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Algorithms for scheduling computations with secondary deadlines to minimize penalty\",\"authors\":\"C. Han, Kwei-Jay Lin\",\"doi\":\"10.1109/EMWRTS.1994.336851\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In many real-time applications, some job allows part of its computation to be executed after its primary deadline but before an extended, or secondary deadline. We study the scheduling issues for real-time computations with secondary deadlines. We call the part of a computation which must be completed before the primary deadline its hard part, and the rest its soft part. The soft part of a computation can be delayed after its primary deadline but must be finished before its secondary deadline. Although the computations have secondary deadlines, it is still desirable to finish the complete computations before their primary deadlines. Therefore, the system receives a penalty for each soft part that finishes after the primary deadline. We present scheduling algorithms for the model which minimizes the total penalty or the maximum penalty.<<ETX>>\",\"PeriodicalId\":322579,\"journal\":{\"name\":\"Proceedings Sixth Euromicro Workshop on Real-Time Systems\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1994-06-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings Sixth Euromicro Workshop on Real-Time Systems\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EMWRTS.1994.336851\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings Sixth Euromicro Workshop on Real-Time Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EMWRTS.1994.336851","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

在许多实时应用程序中,一些作业允许在其主要截止日期之后执行部分计算,但在延长或辅助截止日期之前执行。我们研究了具有次要截止日期的实时计算的调度问题。我们称必须在主要截止日期之前完成的计算部分为硬部分,其余部分为软部分。计算的软部分可以在其主要截止日期之后延迟,但必须在其次要截止日期之前完成。虽然计算有次要截止日期,但仍然希望在其主要截止日期之前完成完整的计算。因此,系统会对每个在主要截止日期之后完成的软部件进行处罚。针对该模型,我们提出了最小化总罚金或最大罚金的调度算法
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Algorithms for scheduling computations with secondary deadlines to minimize penalty
In many real-time applications, some job allows part of its computation to be executed after its primary deadline but before an extended, or secondary deadline. We study the scheduling issues for real-time computations with secondary deadlines. We call the part of a computation which must be completed before the primary deadline its hard part, and the rest its soft part. The soft part of a computation can be delayed after its primary deadline but must be finished before its secondary deadline. Although the computations have secondary deadlines, it is still desirable to finish the complete computations before their primary deadlines. Therefore, the system receives a penalty for each soft part that finishes after the primary deadline. We present scheduling algorithms for the model which minimizes the total penalty or the maximum penalty.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信