{"title":"时变参数未知的线性随机系统的对象选择与测量控制","authors":"T. Upadhyay","doi":"10.1109/CDC.1975.270629","DOIUrl":null,"url":null,"abstract":"The earlier work [7, 8] on the joint adaptive plant and measurement control problem has been restricted to stochastic systems with time-invariant (constant) unknown parameters. This paper extends the results to stochastic systems with time-varying unknown parameters. It is shown that the plant and measurement control calculations can be separated which simplifies the implementation of the scheme.","PeriodicalId":164707,"journal":{"name":"1975 IEEE Conference on Decision and Control including the 14th Symposium on Adaptive Processes","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1975-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"On the simultaneous choice of plant and measurement control for linear stochastic systems with unknown time-varying parameters\",\"authors\":\"T. Upadhyay\",\"doi\":\"10.1109/CDC.1975.270629\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The earlier work [7, 8] on the joint adaptive plant and measurement control problem has been restricted to stochastic systems with time-invariant (constant) unknown parameters. This paper extends the results to stochastic systems with time-varying unknown parameters. It is shown that the plant and measurement control calculations can be separated which simplifies the implementation of the scheme.\",\"PeriodicalId\":164707,\"journal\":{\"name\":\"1975 IEEE Conference on Decision and Control including the 14th Symposium on Adaptive Processes\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1975-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1975 IEEE Conference on Decision and Control including the 14th Symposium on Adaptive Processes\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CDC.1975.270629\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1975 IEEE Conference on Decision and Control including the 14th Symposium on Adaptive Processes","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CDC.1975.270629","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
On the simultaneous choice of plant and measurement control for linear stochastic systems with unknown time-varying parameters
The earlier work [7, 8] on the joint adaptive plant and measurement control problem has been restricted to stochastic systems with time-invariant (constant) unknown parameters. This paper extends the results to stochastic systems with time-varying unknown parameters. It is shown that the plant and measurement control calculations can be separated which simplifies the implementation of the scheme.