{"title":"2019冠状病毒病大流行期间马来西亚海上油井塞弃作业管理最佳实践","authors":"Arie Muchalis Utta, Junnyaruin Barat, L. Maluan, Mohd Zulkifli Omar, F. Yahaya, Budi Mawardi Nasron","doi":"10.2118/208465-ms","DOIUrl":null,"url":null,"abstract":"\n In 2020, PCSB implemented the first permanent Plug & Abandonment (P&A) campaign for three Subsea wells in a gas field offshore Malaysia. The main objective of the campaign was to establish two (2) barriers for every movable hydrocarbon or overpressure bearing sand by placing laterally extended cement plug across impermeable formation with enough formation strength to handle the pressure of the formation to be isolated. The unique case of this operation was the challenges to execute PCSB's first subsea P&A operation in gas field Malaysia during pandemic situation. In March 2020, the Malaysian government imposed Movement Control Order (MCO) to curb the spread of the COVID-19. A semi-submersible rig was on-hired a week after government initiated the MCO, resulted in the rig preparation being badly hampered due to manpower management and material fabrication and delivery. PCSB was exposed to expensive rig daily rate that had to be managed. Four (4) main challenges were encountered during operation: safe protection for workers, expensive standby cost, manpower management and material fabrication and delivery. This paper, from the ‘project management’ point of view, describes the journey of managing rig operation during PCSB's first subsea wells P&A in Malaysia efficiently amidst the pandemic by reducing the impact of COVID-19 on project cost. With the experience of managing rig for subsea well operation, a complex operation in Malaysia, amidst pandemic, PCSB sharing on the experience is beneficial to provide context setting and benchmark on maintaining the efficiency of operation. Wells successfully met the objective of operation with no incident occurred, negotiated reduction on standby cost and managed to bring critical manpower on time during operation.","PeriodicalId":335246,"journal":{"name":"Day 1 Tue, November 30, 2021","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Best Practices for Managing Subsea Well Plug and Abandonment Operation in Offshore Malaysia During COVID-19 Pandemic\",\"authors\":\"Arie Muchalis Utta, Junnyaruin Barat, L. Maluan, Mohd Zulkifli Omar, F. Yahaya, Budi Mawardi Nasron\",\"doi\":\"10.2118/208465-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n In 2020, PCSB implemented the first permanent Plug & Abandonment (P&A) campaign for three Subsea wells in a gas field offshore Malaysia. The main objective of the campaign was to establish two (2) barriers for every movable hydrocarbon or overpressure bearing sand by placing laterally extended cement plug across impermeable formation with enough formation strength to handle the pressure of the formation to be isolated. The unique case of this operation was the challenges to execute PCSB's first subsea P&A operation in gas field Malaysia during pandemic situation. In March 2020, the Malaysian government imposed Movement Control Order (MCO) to curb the spread of the COVID-19. A semi-submersible rig was on-hired a week after government initiated the MCO, resulted in the rig preparation being badly hampered due to manpower management and material fabrication and delivery. PCSB was exposed to expensive rig daily rate that had to be managed. Four (4) main challenges were encountered during operation: safe protection for workers, expensive standby cost, manpower management and material fabrication and delivery. This paper, from the ‘project management’ point of view, describes the journey of managing rig operation during PCSB's first subsea wells P&A in Malaysia efficiently amidst the pandemic by reducing the impact of COVID-19 on project cost. With the experience of managing rig for subsea well operation, a complex operation in Malaysia, amidst pandemic, PCSB sharing on the experience is beneficial to provide context setting and benchmark on maintaining the efficiency of operation. Wells successfully met the objective of operation with no incident occurred, negotiated reduction on standby cost and managed to bring critical manpower on time during operation.\",\"PeriodicalId\":335246,\"journal\":{\"name\":\"Day 1 Tue, November 30, 2021\",\"volume\":\"7 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Tue, November 30, 2021\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/208465-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Tue, November 30, 2021","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/208465-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

2020年,PCSB对马来西亚海上气田的三口海底井实施了第一次永久性封井和弃井(P&A)作业。该作业的主要目标是通过在不渗透地层上放置横向延伸的水泥塞,为每一个可移动的油气或含超压砂建立两(2)个屏障,这些水泥塞具有足够的地层强度来应对待隔离地层的压力。此次作业的独特之处在于,在疫情期间,PCSB在马来西亚气田进行了首次海底弃井作业。2020年3月,马来西亚政府实施了行动控制令(MCO),以遏制新冠肺炎的传播。在政府启动MCO一周后,半潜式钻井平台被租用,由于人力管理和材料制造和交付,导致钻井准备工作严重受阻。PCSB不得不承担昂贵的钻机日费率。在操作过程中遇到了四个主要挑战:工人的安全保护、昂贵的备用成本、人力管理和材料制造和交付。本文从“项目管理”的角度,描述了PCSB在马来西亚进行的第一次海底井弃井作业期间,通过减少COVID-19对项目成本的影响,有效地管理钻井作业的过程。PCSB在马来西亚拥有管理海底油井作业平台的经验,这是一项复杂的作业,在疫情期间,PCSB分享经验有助于为保持作业效率提供背景设置和基准。井成功地实现了作业目标,没有发生任何事故,通过谈判降低了备用成本,并在作业期间及时提供了关键人力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Best Practices for Managing Subsea Well Plug and Abandonment Operation in Offshore Malaysia During COVID-19 Pandemic
In 2020, PCSB implemented the first permanent Plug & Abandonment (P&A) campaign for three Subsea wells in a gas field offshore Malaysia. The main objective of the campaign was to establish two (2) barriers for every movable hydrocarbon or overpressure bearing sand by placing laterally extended cement plug across impermeable formation with enough formation strength to handle the pressure of the formation to be isolated. The unique case of this operation was the challenges to execute PCSB's first subsea P&A operation in gas field Malaysia during pandemic situation. In March 2020, the Malaysian government imposed Movement Control Order (MCO) to curb the spread of the COVID-19. A semi-submersible rig was on-hired a week after government initiated the MCO, resulted in the rig preparation being badly hampered due to manpower management and material fabrication and delivery. PCSB was exposed to expensive rig daily rate that had to be managed. Four (4) main challenges were encountered during operation: safe protection for workers, expensive standby cost, manpower management and material fabrication and delivery. This paper, from the ‘project management’ point of view, describes the journey of managing rig operation during PCSB's first subsea wells P&A in Malaysia efficiently amidst the pandemic by reducing the impact of COVID-19 on project cost. With the experience of managing rig for subsea well operation, a complex operation in Malaysia, amidst pandemic, PCSB sharing on the experience is beneficial to provide context setting and benchmark on maintaining the efficiency of operation. Wells successfully met the objective of operation with no incident occurred, negotiated reduction on standby cost and managed to bring critical manpower on time during operation.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信