异构集群动态任务调度

Jorge G. Barbosa, B. Moreira
{"title":"异构集群动态任务调度","authors":"Jorge G. Barbosa, B. Moreira","doi":"10.1109/ISPDC.2009.19","DOIUrl":null,"url":null,"abstract":"This paper addresses the problem of scheduling dynamicallymulti-user and independent jobs on clusters, both homogeneous and heterogeneous. The dynamic behaviormeans that the scheduler is able to adapt the schedulingwhen new jobs are submitted and also when processorsavailability changes. The scheduler has two main featurescomparing to other solutions: it considers a job as beingdescribed by a direct acyclic graph (DAG) and it is ableto schedule parallel tasks, when appropriate, instead of the common dynamic mapping approach that assigns an entirejob to a processor or a fixed set of processors. The scheduling method is divided in a scheduling strategy and a scheduler algorithm, so that other scheduling algorithms can be incorporated. In this paper two static DAG schedulers for heterogeneous machines are considered. The results show the behavior of the scheduling method for the short completion time of a batch of jobs. These results show better performance when compared to the common schedulers strategies that fix the number of processors per job or assign one processor per job.","PeriodicalId":226126,"journal":{"name":"2009 Eighth International Symposium on Parallel and Distributed Computing","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"25","resultStr":"{\"title\":\"Dynamic Job Scheduling on Heterogeneous Clusters\",\"authors\":\"Jorge G. Barbosa, B. Moreira\",\"doi\":\"10.1109/ISPDC.2009.19\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper addresses the problem of scheduling dynamicallymulti-user and independent jobs on clusters, both homogeneous and heterogeneous. The dynamic behaviormeans that the scheduler is able to adapt the schedulingwhen new jobs are submitted and also when processorsavailability changes. The scheduler has two main featurescomparing to other solutions: it considers a job as beingdescribed by a direct acyclic graph (DAG) and it is ableto schedule parallel tasks, when appropriate, instead of the common dynamic mapping approach that assigns an entirejob to a processor or a fixed set of processors. The scheduling method is divided in a scheduling strategy and a scheduler algorithm, so that other scheduling algorithms can be incorporated. In this paper two static DAG schedulers for heterogeneous machines are considered. The results show the behavior of the scheduling method for the short completion time of a batch of jobs. These results show better performance when compared to the common schedulers strategies that fix the number of processors per job or assign one processor per job.\",\"PeriodicalId\":226126,\"journal\":{\"name\":\"2009 Eighth International Symposium on Parallel and Distributed Computing\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"25\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 Eighth International Symposium on Parallel and Distributed Computing\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISPDC.2009.19\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Eighth International Symposium on Parallel and Distributed Computing","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISPDC.2009.19","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 25

摘要

本文研究了同构和异构集群上多用户独立作业的动态调度问题。动态行为意味着调度程序能够在提交新作业时以及处理器可用性发生变化时调整调度。与其他解决方案相比,调度器有两个主要特性:它认为作业是由直接无环图(DAG)描述的,并且它能够在适当的时候调度并行任务,而不是将整个作业分配给处理器或固定处理器集的常见动态映射方法。该调度方法分为调度策略和调度算法两部分,便于合并其他调度算法。本文研究了两种异构机器的静态DAG调度器。结果显示了该调度方法在批量作业完成时间较短的情况下的表现。与固定每个作业的处理器数量或为每个作业分配一个处理器的常见调度器策略相比,这些结果显示出更好的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Dynamic Job Scheduling on Heterogeneous Clusters
This paper addresses the problem of scheduling dynamicallymulti-user and independent jobs on clusters, both homogeneous and heterogeneous. The dynamic behaviormeans that the scheduler is able to adapt the schedulingwhen new jobs are submitted and also when processorsavailability changes. The scheduler has two main featurescomparing to other solutions: it considers a job as beingdescribed by a direct acyclic graph (DAG) and it is ableto schedule parallel tasks, when appropriate, instead of the common dynamic mapping approach that assigns an entirejob to a processor or a fixed set of processors. The scheduling method is divided in a scheduling strategy and a scheduler algorithm, so that other scheduling algorithms can be incorporated. In this paper two static DAG schedulers for heterogeneous machines are considered. The results show the behavior of the scheduling method for the short completion time of a batch of jobs. These results show better performance when compared to the common schedulers strategies that fix the number of processors per job or assign one processor per job.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信