基于离散事件仿真的陆航维修方法比较

Zachary M. Bell, Edward Teague
{"title":"基于离散事件仿真的陆航维修方法比较","authors":"Zachary M. Bell, Edward Teague","doi":"10.1109/SIEDS.2014.6829920","DOIUrl":null,"url":null,"abstract":"Army Aviation utilizes two distinct types of overhaul maintenance schedules on its rotary wing aircraft, Phase Maintenance and Progressive Phase Maintenance. All but one aircraft, the OH-58D Kiowa Warrior, use Phase Maintenance. This aircraft has both the highest operational readiness rate and average flight hours in the Army's rotary wing fleet. The Army values uniformity in maintenance procedures across its fleets; however this inconsistency has existed for two decades. This study models the value and tradeoffs of one method versus the other using discrete event simulation. Progressive Phase Maintenance offers more efficiency in terms of time available for missions and may be applicable other airframes. Using the airframe specific Aeronautical Equipment Maintenance Management Policies and Procedures Training Manual and a operational data set from a deployed aviation unit, this study compares the two overhaul maintenance schedules in terms of operational readiness. The effectiveness of each method is measured in the amount of time each airframe is for missions.","PeriodicalId":441073,"journal":{"name":"2014 Systems and Information Engineering Design Symposium (SIEDS)","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-04-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Comparison of Army Aviation maintenance methods via discrete event simulation\",\"authors\":\"Zachary M. Bell, Edward Teague\",\"doi\":\"10.1109/SIEDS.2014.6829920\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Army Aviation utilizes two distinct types of overhaul maintenance schedules on its rotary wing aircraft, Phase Maintenance and Progressive Phase Maintenance. All but one aircraft, the OH-58D Kiowa Warrior, use Phase Maintenance. This aircraft has both the highest operational readiness rate and average flight hours in the Army's rotary wing fleet. The Army values uniformity in maintenance procedures across its fleets; however this inconsistency has existed for two decades. This study models the value and tradeoffs of one method versus the other using discrete event simulation. Progressive Phase Maintenance offers more efficiency in terms of time available for missions and may be applicable other airframes. Using the airframe specific Aeronautical Equipment Maintenance Management Policies and Procedures Training Manual and a operational data set from a deployed aviation unit, this study compares the two overhaul maintenance schedules in terms of operational readiness. The effectiveness of each method is measured in the amount of time each airframe is for missions.\",\"PeriodicalId\":441073,\"journal\":{\"name\":\"2014 Systems and Information Engineering Design Symposium (SIEDS)\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-04-25\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 Systems and Information Engineering Design Symposium (SIEDS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/SIEDS.2014.6829920\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 Systems and Information Engineering Design Symposium (SIEDS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SIEDS.2014.6829920","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

陆军航空兵在其旋翼飞机上采用两种不同类型的大修维护计划,阶段维护和渐进阶段维护。除了OH-58D“基奥瓦勇士”(Kiowa Warrior)一架飞机外,所有飞机都使用“阶段维护”。这种飞机在陆军旋翼机队中具有最高的战备就绪率和平均飞行时间。陆军重视各舰队维修程序的统一性;然而,这种不一致已经存在了二十年。本研究使用离散事件模拟对一种方法与另一种方法的价值和权衡进行了建模。渐进式阶段维修在执行任务的可用时间方面效率更高,可能适用于其他机身。本研究使用机身特定的航空设备维修管理政策和程序培训手册以及部署的航空单位的操作数据集,比较了两种大修维修计划的操作准备情况。每一种方法的有效性都是以每架飞机执行任务的时间来衡量的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Comparison of Army Aviation maintenance methods via discrete event simulation
Army Aviation utilizes two distinct types of overhaul maintenance schedules on its rotary wing aircraft, Phase Maintenance and Progressive Phase Maintenance. All but one aircraft, the OH-58D Kiowa Warrior, use Phase Maintenance. This aircraft has both the highest operational readiness rate and average flight hours in the Army's rotary wing fleet. The Army values uniformity in maintenance procedures across its fleets; however this inconsistency has existed for two decades. This study models the value and tradeoffs of one method versus the other using discrete event simulation. Progressive Phase Maintenance offers more efficiency in terms of time available for missions and may be applicable other airframes. Using the airframe specific Aeronautical Equipment Maintenance Management Policies and Procedures Training Manual and a operational data set from a deployed aviation unit, this study compares the two overhaul maintenance schedules in terms of operational readiness. The effectiveness of each method is measured in the amount of time each airframe is for missions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信