应用价值流映射(VSM)方法,通过减少生产部门的交货期来优化工作空间

Novera Elisa Triana, Sakti Aji Lesmana
{"title":"应用价值流映射(VSM)方法,通过减少生产部门的交货期来优化工作空间","authors":"Novera Elisa Triana, Sakti Aji Lesmana","doi":"10.31695/ijerat.2020.3622","DOIUrl":null,"url":null,"abstract":"Every company, especially manufacturing companies are required to make efficiency in each line to increase productivity in order to compete with other companies. With the increasing demand for new products from customers, or usually called a New Project, companies are challenged to utilize the work area as much as possible with the existence of new production lines to meet the customer's demand. To do that, the company should immediately make improvements on all lines so that free space will be obtained which will be used for new projects. To reduce the Lead Time on the line in the production department with the expectation to get an optimal working area which creating space to be used for a New Project. Using the Value Stream Mapping method as a first step to mapping the entire process from upstream to downstream to identify Lead Time and lead to waste in each process. High waste occurs in the inventory lead time. Non-value added activities are mostly found in the inventory part after platting in receiving and finished good parts. It also found in the information flow of the finished good parts. While developing the future state map, it decreased the total lead time by about 5% so that it creating a workspace for the new projects.","PeriodicalId":424923,"journal":{"name":"International Journal of Engineering Research and Advanced Technology","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-07-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Application of Lean Manufacturing to Optimize Working Space by Reducing Lead Time in the Production Department Using the Value Stream Mapping (VSM) Method\",\"authors\":\"Novera Elisa Triana, Sakti Aji Lesmana\",\"doi\":\"10.31695/ijerat.2020.3622\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Every company, especially manufacturing companies are required to make efficiency in each line to increase productivity in order to compete with other companies. With the increasing demand for new products from customers, or usually called a New Project, companies are challenged to utilize the work area as much as possible with the existence of new production lines to meet the customer's demand. To do that, the company should immediately make improvements on all lines so that free space will be obtained which will be used for new projects. To reduce the Lead Time on the line in the production department with the expectation to get an optimal working area which creating space to be used for a New Project. Using the Value Stream Mapping method as a first step to mapping the entire process from upstream to downstream to identify Lead Time and lead to waste in each process. High waste occurs in the inventory lead time. Non-value added activities are mostly found in the inventory part after platting in receiving and finished good parts. It also found in the information flow of the finished good parts. While developing the future state map, it decreased the total lead time by about 5% so that it creating a workspace for the new projects.\",\"PeriodicalId\":424923,\"journal\":{\"name\":\"International Journal of Engineering Research and Advanced Technology\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-07-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Engineering Research and Advanced Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31695/ijerat.2020.3622\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Engineering Research and Advanced Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31695/ijerat.2020.3622","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

为了与其他公司竞争,每个公司,特别是制造公司都需要提高每条生产线的效率,以提高生产率。随着客户对新产品的需求不断增加,或者通常称为新项目,公司面临的挑战是尽可能多地利用工作区域和新生产线的存在来满足客户的需求。要做到这一点,公司应该立即对所有线路进行改进,以便获得用于新项目的空闲空间。减少生产线上生产部门的交货时间,期望得到一个最佳的工作区域,为新项目创造空间。使用价值流映射方法作为从上游到下游映射整个过程的第一步,以确定每个过程中的前置时间和导致浪费。高浪费发生在库存交货期。非增值活动主要发生在收货件和成品件镀后的库存部分。在信息流中也发现了成品好的零件。在开发未来状态图时,它减少了大约5%的总交付时间,以便为新项目创建一个工作空间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Application of Lean Manufacturing to Optimize Working Space by Reducing Lead Time in the Production Department Using the Value Stream Mapping (VSM) Method
Every company, especially manufacturing companies are required to make efficiency in each line to increase productivity in order to compete with other companies. With the increasing demand for new products from customers, or usually called a New Project, companies are challenged to utilize the work area as much as possible with the existence of new production lines to meet the customer's demand. To do that, the company should immediately make improvements on all lines so that free space will be obtained which will be used for new projects. To reduce the Lead Time on the line in the production department with the expectation to get an optimal working area which creating space to be used for a New Project. Using the Value Stream Mapping method as a first step to mapping the entire process from upstream to downstream to identify Lead Time and lead to waste in each process. High waste occurs in the inventory lead time. Non-value added activities are mostly found in the inventory part after platting in receiving and finished good parts. It also found in the information flow of the finished good parts. While developing the future state map, it decreased the total lead time by about 5% so that it creating a workspace for the new projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信