电力系统负荷自动转移(环网)

C. Radhika, P. Bharathan
{"title":"电力系统负荷自动转移(环网)","authors":"C. Radhika, P. Bharathan","doi":"10.1109/PICC.2015.7455766","DOIUrl":null,"url":null,"abstract":"Power systems are getting complicated as load centers get connected through network thus forming power grids. Since then black outs of power systems have become common. In an interconnected system, the loss of generation in one area can be replaced by generation from other areas. Thus, several systems interconnected can survive contingencies that the individual systems could not. Thus one benefit of interconnected power systems is the potential for increased reliability. This paper discusses the implementation of an automatic load transfer program in a ring electrical network using supervisory control and data acquisition (SCADA) system that automates electric power system operations thus maintaining reliability.","PeriodicalId":373395,"journal":{"name":"2015 International Conference on Power, Instrumentation, Control and Computing (PICC)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"Automatic load transfer in electrical power system (In ring electrical network)\",\"authors\":\"C. Radhika, P. Bharathan\",\"doi\":\"10.1109/PICC.2015.7455766\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Power systems are getting complicated as load centers get connected through network thus forming power grids. Since then black outs of power systems have become common. In an interconnected system, the loss of generation in one area can be replaced by generation from other areas. Thus, several systems interconnected can survive contingencies that the individual systems could not. Thus one benefit of interconnected power systems is the potential for increased reliability. This paper discusses the implementation of an automatic load transfer program in a ring electrical network using supervisory control and data acquisition (SCADA) system that automates electric power system operations thus maintaining reliability.\",\"PeriodicalId\":373395,\"journal\":{\"name\":\"2015 International Conference on Power, Instrumentation, Control and Computing (PICC)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 International Conference on Power, Instrumentation, Control and Computing (PICC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PICC.2015.7455766\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Power, Instrumentation, Control and Computing (PICC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PICC.2015.7455766","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

摘要

随着各负荷中心通过网络相互连接,形成电网,电力系统日趋复杂。从那以后,电力系统的停电变得很普遍。在互联系统中,一个地区的发电损失可以由其他地区的发电弥补。因此,几个相互连接的系统可以在个别系统无法承受的突发事件中幸存下来。因此,互联电力系统的一个好处是有可能提高可靠性。本文讨论了利用监控和数据采集(SCADA)系统在环形电网中实现负荷自动转移程序,使电力系统运行自动化,从而保持可靠性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Automatic load transfer in electrical power system (In ring electrical network)
Power systems are getting complicated as load centers get connected through network thus forming power grids. Since then black outs of power systems have become common. In an interconnected system, the loss of generation in one area can be replaced by generation from other areas. Thus, several systems interconnected can survive contingencies that the individual systems could not. Thus one benefit of interconnected power systems is the potential for increased reliability. This paper discusses the implementation of an automatic load transfer program in a ring electrical network using supervisory control and data acquisition (SCADA) system that automates electric power system operations thus maintaining reliability.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信