在竞争激烈的电力市场中,迪斯科舞厅的综合短期运作架构

A. Algarni, Kankar Bhattacharya
{"title":"在竞争激烈的电力市场中,迪斯科舞厅的综合短期运作架构","authors":"A. Algarni, Kankar Bhattacharya","doi":"10.1109/EPC.2007.4520372","DOIUrl":null,"url":null,"abstract":"A comprehensive operational planning model for a disco operating in a competitive environment is presented in this paper. The operational planning function is a two-level model in which the first level deals with the disco's activities in the day- ahead stage. In the second level, the model deals with the disco's activities in the real-time stage. The first level model determines the disco's operational decisions with regard to its grid purchase, scheduling of any distributed generation (DG) sources owned by it, or purchase scheduling of investor-owned DG, contracting for interruptible loads. These decisions are imposed as binding constraints in the real-time model and the disco seeks to minimize its short-term costs keeping in mind its day-ahead decisions. A case-study is carried out considering the well-known 33-bus distribution system.","PeriodicalId":196861,"journal":{"name":"2007 IEEE Canada Electrical Power Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"A Comprehensive Short-Term Operations Framework for a Disco in Competitive Electricity Markets\",\"authors\":\"A. Algarni, Kankar Bhattacharya\",\"doi\":\"10.1109/EPC.2007.4520372\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A comprehensive operational planning model for a disco operating in a competitive environment is presented in this paper. The operational planning function is a two-level model in which the first level deals with the disco's activities in the day- ahead stage. In the second level, the model deals with the disco's activities in the real-time stage. The first level model determines the disco's operational decisions with regard to its grid purchase, scheduling of any distributed generation (DG) sources owned by it, or purchase scheduling of investor-owned DG, contracting for interruptible loads. These decisions are imposed as binding constraints in the real-time model and the disco seeks to minimize its short-term costs keeping in mind its day-ahead decisions. A case-study is carried out considering the well-known 33-bus distribution system.\",\"PeriodicalId\":196861,\"journal\":{\"name\":\"2007 IEEE Canada Electrical Power Conference\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Canada Electrical Power Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/EPC.2007.4520372\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Canada Electrical Power Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EPC.2007.4520372","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

本文提出了竞争环境下迪斯科舞厅综合运营规划模型。运营计划函数是一个两层模型,其中第一级处理迪斯科舞厅在前一天的活动。在第二层,模型在实时阶段处理迪斯科舞厅的活动。第一级模型决定了迪斯科迪斯科的运营决策,涉及其电网购买,其拥有的任何分布式发电(DG)源的调度,或投资者拥有的DG的购买调度,承包可中断负载。这些决策在实时模型中作为绑定约束施加,并且迪斯科舞厅在记住其前一天的决策的情况下寻求将其短期成本最小化。以著名的33总线配电系统为例进行了分析。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A Comprehensive Short-Term Operations Framework for a Disco in Competitive Electricity Markets
A comprehensive operational planning model for a disco operating in a competitive environment is presented in this paper. The operational planning function is a two-level model in which the first level deals with the disco's activities in the day- ahead stage. In the second level, the model deals with the disco's activities in the real-time stage. The first level model determines the disco's operational decisions with regard to its grid purchase, scheduling of any distributed generation (DG) sources owned by it, or purchase scheduling of investor-owned DG, contracting for interruptible loads. These decisions are imposed as binding constraints in the real-time model and the disco seeks to minimize its short-term costs keeping in mind its day-ahead decisions. A case-study is carried out considering the well-known 33-bus distribution system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信