{"title":"一个o∥log p)并行实现的反馈导向动态循环调度","authors":"T. Tabirca, Len Freeman, S. Tabirca","doi":"10.1080/10637190208941438","DOIUrl":null,"url":null,"abstract":"Feedback Guided Dynamic Loop Scheduling (FGDLS) is a recently proposed dynamic algorithm for loop scheduling. The original algorithm required an O(p) serial computation at each stage to compute the updated loop schedule. In this paper, it is shown that this computation can be implemented in O(log p) operations on p processors","PeriodicalId":406098,"journal":{"name":"Parallel Algorithms and Applications","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2002-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":"{\"title\":\"AN O∥LOG P) PARALLEL IMPLEMENTATION OF FEEDBACK GUIDED DYNAMIC LOOP SCHEDULING\",\"authors\":\"T. Tabirca, Len Freeman, S. Tabirca\",\"doi\":\"10.1080/10637190208941438\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Feedback Guided Dynamic Loop Scheduling (FGDLS) is a recently proposed dynamic algorithm for loop scheduling. The original algorithm required an O(p) serial computation at each stage to compute the updated loop schedule. In this paper, it is shown that this computation can be implemented in O(log p) operations on p processors\",\"PeriodicalId\":406098,\"journal\":{\"name\":\"Parallel Algorithms and Applications\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2002-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"5\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Parallel Algorithms and Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/10637190208941438\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Parallel Algorithms and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10637190208941438","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
AN O∥LOG P) PARALLEL IMPLEMENTATION OF FEEDBACK GUIDED DYNAMIC LOOP SCHEDULING
Feedback Guided Dynamic Loop Scheduling (FGDLS) is a recently proposed dynamic algorithm for loop scheduling. The original algorithm required an O(p) serial computation at each stage to compute the updated loop schedule. In this paper, it is shown that this computation can be implemented in O(log p) operations on p processors