{"title":"区域定价电力市场中的再分配","authors":"Mario Blázquez de Paz","doi":"10.2139/ssrn.3644217","DOIUrl":null,"url":null,"abstract":"Zonal pricing electricity markets operate sequentially. First, the suppliers compete in a spot market. Second, to alleviate the congestion in the transmission line, in a redispatch market, the suppliers in the importing node are called into operation to increase their production, and the suppliers in the exporting node are compensated to reduce their production. I characterize the equilibrium in a zonal market when the competition is imperfect and the spot and redispatch markets operate sequentially. I also work out the equilibrium when the transmission line is taken into account in the spot market, i.e., it is not necessary to introduce a redispatch market to alleviate the congestion in the transmission line. I find that the consumers' welfare and suppliers' profits depend crucially on the type of redispatch design implemented by the auctioneer, and that could introduce long term investment distortions.","PeriodicalId":400187,"journal":{"name":"EnergyRN: Energy Economics (Topic)","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Redispatch in Zonal Pricing Electricity Markets\",\"authors\":\"Mario Blázquez de Paz\",\"doi\":\"10.2139/ssrn.3644217\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Zonal pricing electricity markets operate sequentially. First, the suppliers compete in a spot market. Second, to alleviate the congestion in the transmission line, in a redispatch market, the suppliers in the importing node are called into operation to increase their production, and the suppliers in the exporting node are compensated to reduce their production. I characterize the equilibrium in a zonal market when the competition is imperfect and the spot and redispatch markets operate sequentially. I also work out the equilibrium when the transmission line is taken into account in the spot market, i.e., it is not necessary to introduce a redispatch market to alleviate the congestion in the transmission line. I find that the consumers' welfare and suppliers' profits depend crucially on the type of redispatch design implemented by the auctioneer, and that could introduce long term investment distortions.\",\"PeriodicalId\":400187,\"journal\":{\"name\":\"EnergyRN: Energy Economics (Topic)\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"EnergyRN: Energy Economics (Topic)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2139/ssrn.3644217\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"EnergyRN: Energy Economics (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2139/ssrn.3644217","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Zonal pricing electricity markets operate sequentially. First, the suppliers compete in a spot market. Second, to alleviate the congestion in the transmission line, in a redispatch market, the suppliers in the importing node are called into operation to increase their production, and the suppliers in the exporting node are compensated to reduce their production. I characterize the equilibrium in a zonal market when the competition is imperfect and the spot and redispatch markets operate sequentially. I also work out the equilibrium when the transmission line is taken into account in the spot market, i.e., it is not necessary to introduce a redispatch market to alleviate the congestion in the transmission line. I find that the consumers' welfare and suppliers' profits depend crucially on the type of redispatch design implemented by the auctioneer, and that could introduce long term investment distortions.