{"title":"应急流程设计","authors":"Olga Jaufman","doi":"10.1145/1062455.1062587","DOIUrl":null,"url":null,"abstract":"The typical situation in software developing organizations can be characterized by two extremes: in some organizations or organizational units, software development processes are partly defined, whereas in organizations or organizational units where the processses are well defined, these processes are usually only valid at the project start. For design of a process that is able to fulfil the requirements, the author proposes an emergent process design (EPD) approach. The EPD approach guides the extraction and the adaptation of a project-specific process. This is done as follows. Initially, the project-specific process frame is extracted by tailoring one of the process variants provided in a process line. The first development is based on the tailored process frame. For further development iterations or projects that are to utilize this frame, the frame is adapted and refined to the project-specific process based on the logs of the performed tasks in the previous process iteration. In order to insure the desired quality of the final product, the project-specific process becomes more stringent over the course of the project.","PeriodicalId":217879,"journal":{"name":"Proceedings. 27th International Conference on Software Engineering, 2005. ICSE 2005.","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-05-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Emergent process design\",\"authors\":\"Olga Jaufman\",\"doi\":\"10.1145/1062455.1062587\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The typical situation in software developing organizations can be characterized by two extremes: in some organizations or organizational units, software development processes are partly defined, whereas in organizations or organizational units where the processses are well defined, these processes are usually only valid at the project start. For design of a process that is able to fulfil the requirements, the author proposes an emergent process design (EPD) approach. The EPD approach guides the extraction and the adaptation of a project-specific process. This is done as follows. Initially, the project-specific process frame is extracted by tailoring one of the process variants provided in a process line. The first development is based on the tailored process frame. For further development iterations or projects that are to utilize this frame, the frame is adapted and refined to the project-specific process based on the logs of the performed tasks in the previous process iteration. In order to insure the desired quality of the final product, the project-specific process becomes more stringent over the course of the project.\",\"PeriodicalId\":217879,\"journal\":{\"name\":\"Proceedings. 27th International Conference on Software Engineering, 2005. ICSE 2005.\",\"volume\":\"83 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-05-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings. 27th International Conference on Software Engineering, 2005. ICSE 2005.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/1062455.1062587\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings. 27th International Conference on Software Engineering, 2005. ICSE 2005.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/1062455.1062587","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

软件开发组织中的典型情况可以表现为两个极端:在一些组织或组织单元中,软件开发过程是部分定义的,而在过程定义良好的组织或组织单元中,这些过程通常仅在项目开始时有效。为了设计一个能够满足需求的过程,作者提出了一种紧急过程设计(EPD)方法。环境保护署的方法指导项目特定过程的提取和调整。这是这样做的。最初,特定于项目的过程框架是通过裁剪过程线中提供的过程变体之一来提取的。第一个开发是基于定制的过程框架。对于要利用此框架的进一步开发迭代或项目,该框架将根据前一个过程迭代中执行任务的日志调整并细化为特定于项目的过程。为了确保最终产品的预期质量,特定于项目的过程在项目过程中变得更加严格。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Emergent process design
The typical situation in software developing organizations can be characterized by two extremes: in some organizations or organizational units, software development processes are partly defined, whereas in organizations or organizational units where the processses are well defined, these processes are usually only valid at the project start. For design of a process that is able to fulfil the requirements, the author proposes an emergent process design (EPD) approach. The EPD approach guides the extraction and the adaptation of a project-specific process. This is done as follows. Initially, the project-specific process frame is extracted by tailoring one of the process variants provided in a process line. The first development is based on the tailored process frame. For further development iterations or projects that are to utilize this frame, the frame is adapted and refined to the project-specific process based on the logs of the performed tasks in the previous process iteration. In order to insure the desired quality of the final product, the project-specific process becomes more stringent over the course of the project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信