Hiroto Tanouchi, H. Amaguchi, A. Kawamura, N. Nakagawa, Tatsuya Koga
{"title":"面向城市暴雨径流分析的小路段自动化施工方法研究","authors":"Hiroto Tanouchi, H. Amaguchi, A. Kawamura, N. Nakagawa, Tatsuya Koga","doi":"10.5638/THAGIS.22.93","DOIUrl":null,"url":null,"abstract":": In this study, a new automated construction method of minute road segments is developed. Numerical simulation models for rainfall-runoff and flood inundation model considering process on roads were based on so-called “Minute road segments” that are formed as simple shape polygons to calculate the flow on roads. In the developed method, firstly crossroads are demarcated from road sections of uninterrupted flow in order to simplify a polygon of road. Secondly road sec tions and crossroads are divided into minute road segments. The developed method was applied for Kanda catchment and the shapes of minute road segments were validated.It was demonstrated that minute road segments can be created by using the method of this study.","PeriodicalId":177070,"journal":{"name":"Theory and Applications of GIS","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Study on an Automated Construction Method of Minute Road Segments aiming at Urban Storm Runoff Analysis\",\"authors\":\"Hiroto Tanouchi, H. Amaguchi, A. Kawamura, N. Nakagawa, Tatsuya Koga\",\"doi\":\"10.5638/THAGIS.22.93\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": In this study, a new automated construction method of minute road segments is developed. Numerical simulation models for rainfall-runoff and flood inundation model considering process on roads were based on so-called “Minute road segments” that are formed as simple shape polygons to calculate the flow on roads. In the developed method, firstly crossroads are demarcated from road sections of uninterrupted flow in order to simplify a polygon of road. Secondly road sec tions and crossroads are divided into minute road segments. The developed method was applied for Kanda catchment and the shapes of minute road segments were validated.It was demonstrated that minute road segments can be created by using the method of this study.\",\"PeriodicalId\":177070,\"journal\":{\"name\":\"Theory and Applications of GIS\",\"volume\":\"49 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Theory and Applications of GIS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5638/THAGIS.22.93\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Theory and Applications of GIS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5638/THAGIS.22.93","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Study on an Automated Construction Method of Minute Road Segments aiming at Urban Storm Runoff Analysis
: In this study, a new automated construction method of minute road segments is developed. Numerical simulation models for rainfall-runoff and flood inundation model considering process on roads were based on so-called “Minute road segments” that are formed as simple shape polygons to calculate the flow on roads. In the developed method, firstly crossroads are demarcated from road sections of uninterrupted flow in order to simplify a polygon of road. Secondly road sec tions and crossroads are divided into minute road segments. The developed method was applied for Kanda catchment and the shapes of minute road segments were validated.It was demonstrated that minute road segments can be created by using the method of this study.