面向城市暴雨径流分析的小路段自动化施工方法研究

Hiroto Tanouchi, H. Amaguchi, A. Kawamura, N. Nakagawa, Tatsuya Koga
{"title":"面向城市暴雨径流分析的小路段自动化施工方法研究","authors":"Hiroto Tanouchi, H. Amaguchi, A. Kawamura, N. Nakagawa, Tatsuya Koga","doi":"10.5638/THAGIS.22.93","DOIUrl":null,"url":null,"abstract":": In this study, a new automated construction method of minute road segments is developed. Numerical simulation models for rainfall-runoff and flood inundation model considering process on roads were based on so-called “Minute road segments” that are formed as simple shape polygons to calculate the flow on roads. In the developed method, firstly crossroads are demarcated from road sections of uninterrupted flow in order to simplify a polygon of road. Secondly road sec tions and crossroads are divided into minute road segments. The developed method was applied for Kanda catchment and the shapes of minute road segments were validated.It was demonstrated that minute road segments can be created by using the method of this study.","PeriodicalId":177070,"journal":{"name":"Theory and Applications of GIS","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Study on an Automated Construction Method of Minute Road Segments aiming at Urban Storm Runoff Analysis\",\"authors\":\"Hiroto Tanouchi, H. Amaguchi, A. Kawamura, N. Nakagawa, Tatsuya Koga\",\"doi\":\"10.5638/THAGIS.22.93\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": In this study, a new automated construction method of minute road segments is developed. Numerical simulation models for rainfall-runoff and flood inundation model considering process on roads were based on so-called “Minute road segments” that are formed as simple shape polygons to calculate the flow on roads. In the developed method, firstly crossroads are demarcated from road sections of uninterrupted flow in order to simplify a polygon of road. Secondly road sec tions and crossroads are divided into minute road segments. The developed method was applied for Kanda catchment and the shapes of minute road segments were validated.It was demonstrated that minute road segments can be created by using the method of this study.\",\"PeriodicalId\":177070,\"journal\":{\"name\":\"Theory and Applications of GIS\",\"volume\":\"49 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Theory and Applications of GIS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5638/THAGIS.22.93\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Theory and Applications of GIS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5638/THAGIS.22.93","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

本研究提出了一种新的小路段自动化施工方法。考虑道路过程的降雨径流和洪水淹没模型的数值模拟模型是基于所谓的“微小路段”,这些路段被形成简单的形状多边形来计算道路上的流量。该方法首先从不间断流路段中划分十字路口,简化道路多边形;其次,将道路分段和十字路口划分为小路段。将所开发的方法应用于神田流域,并对小路段的形状进行了验证。研究结果表明,该方法可以创建小路段。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Study on an Automated Construction Method of Minute Road Segments aiming at Urban Storm Runoff Analysis
: In this study, a new automated construction method of minute road segments is developed. Numerical simulation models for rainfall-runoff and flood inundation model considering process on roads were based on so-called “Minute road segments” that are formed as simple shape polygons to calculate the flow on roads. In the developed method, firstly crossroads are demarcated from road sections of uninterrupted flow in order to simplify a polygon of road. Secondly road sec tions and crossroads are divided into minute road segments. The developed method was applied for Kanda catchment and the shapes of minute road segments were validated.It was demonstrated that minute road segments can be created by using the method of this study.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信