{"title":"半波长输电线路设计的电气要求","authors":"M. L. Santos, J. Jardini, M. Masuda, G. L. C. Nicola","doi":"10.1109/TDC-LA.2010.5762926","DOIUrl":null,"url":null,"abstract":"A Half-wavelength line (HWLL) is a specific type of power transmission that operates on AC power and the length of which is close to 2500 km for a 60-Hz frequency. Such a line is considered as an option for transmission over long distances. This paper proposes some electrical requirements to be met during design. Also, issues like the economic-based selection of the conductor cross section, the N-1 planning criterion compliance, the tower geometry definition and operation strategies for different load levels are discussed. Short circuit and energization simulation results are also presented. The studies were based on a 1000 kV line carrying 6000 MW.","PeriodicalId":222318,"journal":{"name":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"Electrical requirements for half-wavelength power transmission line design\",\"authors\":\"M. L. Santos, J. Jardini, M. Masuda, G. L. C. Nicola\",\"doi\":\"10.1109/TDC-LA.2010.5762926\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A Half-wavelength line (HWLL) is a specific type of power transmission that operates on AC power and the length of which is close to 2500 km for a 60-Hz frequency. Such a line is considered as an option for transmission over long distances. This paper proposes some electrical requirements to be met during design. Also, issues like the economic-based selection of the conductor cross section, the N-1 planning criterion compliance, the tower geometry definition and operation strategies for different load levels are discussed. Short circuit and energization simulation results are also presented. The studies were based on a 1000 kV line carrying 6000 MW.\",\"PeriodicalId\":222318,\"journal\":{\"name\":\"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-11-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDC-LA.2010.5762926\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE/PES Transmission and Distribution Conference and Exposition: Latin America (T&D-LA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC-LA.2010.5762926","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

半波长线(HWLL)是一种特殊类型的电力传输,它在交流电源上运行,其长度接近2500公里,频率为60赫兹。这种线路被认为是远距离传输的一种选择。本文提出了设计时应满足的电气要求。此外,还讨论了导体截面的经济性选择、N-1规划准则的遵从性、塔的几何形状定义以及不同负荷水平下的运行策略等问题。给出了短路和通电的仿真结果。这些研究是基于一条承载6000兆瓦的1000千伏线路。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Electrical requirements for half-wavelength power transmission line design
A Half-wavelength line (HWLL) is a specific type of power transmission that operates on AC power and the length of which is close to 2500 km for a 60-Hz frequency. Such a line is considered as an option for transmission over long distances. This paper proposes some electrical requirements to be met during design. Also, issues like the economic-based selection of the conductor cross section, the N-1 planning criterion compliance, the tower geometry definition and operation strategies for different load levels are discussed. Short circuit and energization simulation results are also presented. The studies were based on a 1000 kV line carrying 6000 MW.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信