利用SAP ERP系统控制模块,在OJSC“BSW -控股管理公司”BMС完成成品计划初始成本

A. V. Potapenko, S. N. Astratov, I. I. Lavrish
{"title":"利用SAP ERP系统控制模块,在OJSC“BSW -控股管理公司”BMС完成成品计划初始成本","authors":"A. V. Potapenko, S. N. Astratov, I. I. Lavrish","doi":"10.21122/1683-6065-2023-2-70-74","DOIUrl":null,"url":null,"abstract":"The article reveals the process of making up the planned initial cost of finished products and detailing indirect costs on the long‑range production example by means of the “Controlling” module of the SAP ERP system. The problems of displaying indirect costs for product that practically do not depend on the quantity of products produced, and calculating direct costs through a specification mechanism based on a basic material records reference book have been solved. As a solution, the key settings implementation in the system configuration and the set of planning interface programs implementation developed in the ABAP/4 programming language were used.","PeriodicalId":278844,"journal":{"name":"Litiyo i Metallurgiya (FOUNDRY PRODUCTION AND METALLURGY)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-09","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Making up the planned initial cost of finishrd products at OJSC “BSW – Management Company of Holding “BMС” by means of the SAP ERP system controlling module\",\"authors\":\"A. V. Potapenko, S. N. Astratov, I. I. Lavrish\",\"doi\":\"10.21122/1683-6065-2023-2-70-74\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The article reveals the process of making up the planned initial cost of finished products and detailing indirect costs on the long‑range production example by means of the “Controlling” module of the SAP ERP system. The problems of displaying indirect costs for product that practically do not depend on the quantity of products produced, and calculating direct costs through a specification mechanism based on a basic material records reference book have been solved. As a solution, the key settings implementation in the system configuration and the set of planning interface programs implementation developed in the ABAP/4 programming language were used.\",\"PeriodicalId\":278844,\"journal\":{\"name\":\"Litiyo i Metallurgiya (FOUNDRY PRODUCTION AND METALLURGY)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-09\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Litiyo i Metallurgiya (FOUNDRY PRODUCTION AND METALLURGY)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.21122/1683-6065-2023-2-70-74\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Litiyo i Metallurgiya (FOUNDRY PRODUCTION AND METALLURGY)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21122/1683-6065-2023-2-70-74","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文通过SAP ERP系统的“控制”模块,揭示了在长期生产实例上,成品计划初始成本的弥补和间接成本的细化过程。解决了实际不依赖于产品产量的产品间接成本的显示和基于基础材料记录参考书的规范机制计算直接成本的问题。为此,采用ABAP/4编程语言开发的系统组态中的关键设置实现和一套规划接口程序实现。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Making up the planned initial cost of finishrd products at OJSC “BSW – Management Company of Holding “BMС” by means of the SAP ERP system controlling module
The article reveals the process of making up the planned initial cost of finished products and detailing indirect costs on the long‑range production example by means of the “Controlling” module of the SAP ERP system. The problems of displaying indirect costs for product that practically do not depend on the quantity of products produced, and calculating direct costs through a specification mechanism based on a basic material records reference book have been solved. As a solution, the key settings implementation in the system configuration and the set of planning interface programs implementation developed in the ABAP/4 programming language were used.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信