{"title":"投资可再生能源:以小型水电项目为例的电厂脱碳研究","authors":"E. Saratian","doi":"10.55927/fjas.v2i7.5315","DOIUrl":null,"url":null,"abstract":"This study aims to analyze and determine the feasibility study of a mini-hydro project with a capacity of 2 x 3 MW in West Java, Indonesia. This research is a qualitative research with a case study approach. The selection of participants in this study used a purposive sampling technique, where the data collected was obtained from primary and secondary data. The data analysis used in this research is cash flow projection evaluation by calculating Payback-Period (PBP), Net Present Value (NPV) and Internal Rate of Return (IRR). Based on the calculations that have been made, the investment feasibility indicators for the projects to be funded are the Payback Period of 8 years and 3 months, the NPV of IDR 3,977 million and the IRR of 11.22% so that the mini-hydro project is said to be feasible to run.","PeriodicalId":417166,"journal":{"name":"Formosa Journal of Applied Sciences","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Investing in Renewable Energy: Decarbonizing Power Plant Industry with the Feasibility Study of Mini-Hydro Project\",\"authors\":\"E. Saratian\",\"doi\":\"10.55927/fjas.v2i7.5315\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study aims to analyze and determine the feasibility study of a mini-hydro project with a capacity of 2 x 3 MW in West Java, Indonesia. This research is a qualitative research with a case study approach. The selection of participants in this study used a purposive sampling technique, where the data collected was obtained from primary and secondary data. The data analysis used in this research is cash flow projection evaluation by calculating Payback-Period (PBP), Net Present Value (NPV) and Internal Rate of Return (IRR). Based on the calculations that have been made, the investment feasibility indicators for the projects to be funded are the Payback Period of 8 years and 3 months, the NPV of IDR 3,977 million and the IRR of 11.22% so that the mini-hydro project is said to be feasible to run.\",\"PeriodicalId\":417166,\"journal\":{\"name\":\"Formosa Journal of Applied Sciences\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Formosa Journal of Applied Sciences\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55927/fjas.v2i7.5315\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Formosa Journal of Applied Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55927/fjas.v2i7.5315","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Investing in Renewable Energy: Decarbonizing Power Plant Industry with the Feasibility Study of Mini-Hydro Project
This study aims to analyze and determine the feasibility study of a mini-hydro project with a capacity of 2 x 3 MW in West Java, Indonesia. This research is a qualitative research with a case study approach. The selection of participants in this study used a purposive sampling technique, where the data collected was obtained from primary and secondary data. The data analysis used in this research is cash flow projection evaluation by calculating Payback-Period (PBP), Net Present Value (NPV) and Internal Rate of Return (IRR). Based on the calculations that have been made, the investment feasibility indicators for the projects to be funded are the Payback Period of 8 years and 3 months, the NPV of IDR 3,977 million and the IRR of 11.22% so that the mini-hydro project is said to be feasible to run.