评估与市场合作计划(KPBU)市场合作计划

Andi Syafirah Putri Abdi Patu, M. H. Akhmadi
{"title":"评估与市场合作计划(KPBU)市场合作计划","authors":"Andi Syafirah Putri Abdi Patu, M. H. Akhmadi","doi":"10.47441/jkp.v16i2.200","DOIUrl":null,"url":null,"abstract":"Public-Private Partnership (PPP) is an infrastructure project financing system developed to solve the limited development budget. The Makassar-Parepare railway is the first PPP project handled by the Ministry of Transportation as the PJPK. This paper aims to evaluate the preparation stage of the Makassar-Parepare project. The research method used is descriptive qualitative. Primary data was collected through interviews. The data obtained were analyzed using the ATLAS.ti application. The results of the study indicate that the PPP preparation of the Makassar-Parepare project has generally been well carried out based on regulations. However, there are some obstacles in the preparation process, such as schedule delays due to land acquisition and the lack of understanding of the person in charge of the cooperation program because of unpreparedness of human resources. Thus, good organizational coordination is needed in the preparation process of the PPP project. \nAbstrak \nKerjasama Pemerintah dengan Badan Usaha (KPBU) merupakan suatu sistem pembiayaan proyek infrastruktur yang dikembangkan dalam rangka mengatasi keterbatasan anggaran pembangunan. Salah satu proyek strategis nasional yang menggunakan skema KPBU saat ini yaitu proyek KPBU Kereta Api (KA) Makassar-Parepare. Tulisan ini bertujuan untuk mengevaluasi tahap penyiapan proyek KPBU KA Makassar-Parepare. Metode penelitian yang digunakan adalah kualitatif deskriptif. Data primer dikumpulkan melalui proses wawancara, sedangkan data sekunder dikumpulkan melalui studi pustaka dan peraturan yang relevan dengan objek penelitian. Data yang diperoleh dianalisis dengan menggunakan aplikasi ATLAS.ti. Hasil penelitian menunjukkan bahwa penyiapan proyek KPBU KA Makassar-Parepare pada umumnya telah dilaksanakan sesuai dengan peraturan yang ada. Meski demikian, terdapat kendala dalam proses penyiapan seperti pada proses penetapan trase jalur kereta api yang mengalami kemunduran jadwal karena permasalahan pembebasan lahan, dan minimnya pemahaman penanggungjawab program kerjasama (PJPK) terhadap konsep KPBU. Hal ini terjadi karena proyek KA Makassar-Parepare merupakan proyek KPBU pertama yang ditangani oleh Kementerian Perhubungan selaku PJPK, sehingga kesiapan sumber daya manusia dan koordinasi organisasi yang baik sangat diperlukan dalam proses penyiapan proyek KPBU kereta api.","PeriodicalId":443153,"journal":{"name":"Jurnal Kebijakan Pembangunan","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Evaluasi Penyiapan Proyek Kerjasama Pemerintah Dengan Badan Usaha (KPBU) Kereta Api Makassar-Parepare\",\"authors\":\"Andi Syafirah Putri Abdi Patu, M. H. Akhmadi\",\"doi\":\"10.47441/jkp.v16i2.200\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Public-Private Partnership (PPP) is an infrastructure project financing system developed to solve the limited development budget. The Makassar-Parepare railway is the first PPP project handled by the Ministry of Transportation as the PJPK. This paper aims to evaluate the preparation stage of the Makassar-Parepare project. The research method used is descriptive qualitative. Primary data was collected through interviews. The data obtained were analyzed using the ATLAS.ti application. The results of the study indicate that the PPP preparation of the Makassar-Parepare project has generally been well carried out based on regulations. However, there are some obstacles in the preparation process, such as schedule delays due to land acquisition and the lack of understanding of the person in charge of the cooperation program because of unpreparedness of human resources. Thus, good organizational coordination is needed in the preparation process of the PPP project. \\nAbstrak \\nKerjasama Pemerintah dengan Badan Usaha (KPBU) merupakan suatu sistem pembiayaan proyek infrastruktur yang dikembangkan dalam rangka mengatasi keterbatasan anggaran pembangunan. Salah satu proyek strategis nasional yang menggunakan skema KPBU saat ini yaitu proyek KPBU Kereta Api (KA) Makassar-Parepare. Tulisan ini bertujuan untuk mengevaluasi tahap penyiapan proyek KPBU KA Makassar-Parepare. Metode penelitian yang digunakan adalah kualitatif deskriptif. Data primer dikumpulkan melalui proses wawancara, sedangkan data sekunder dikumpulkan melalui studi pustaka dan peraturan yang relevan dengan objek penelitian. Data yang diperoleh dianalisis dengan menggunakan aplikasi ATLAS.ti. Hasil penelitian menunjukkan bahwa penyiapan proyek KPBU KA Makassar-Parepare pada umumnya telah dilaksanakan sesuai dengan peraturan yang ada. Meski demikian, terdapat kendala dalam proses penyiapan seperti pada proses penetapan trase jalur kereta api yang mengalami kemunduran jadwal karena permasalahan pembebasan lahan, dan minimnya pemahaman penanggungjawab program kerjasama (PJPK) terhadap konsep KPBU. Hal ini terjadi karena proyek KA Makassar-Parepare merupakan proyek KPBU pertama yang ditangani oleh Kementerian Perhubungan selaku PJPK, sehingga kesiapan sumber daya manusia dan koordinasi organisasi yang baik sangat diperlukan dalam proses penyiapan proyek KPBU kereta api.\",\"PeriodicalId\":443153,\"journal\":{\"name\":\"Jurnal Kebijakan Pembangunan\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Kebijakan Pembangunan\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47441/jkp.v16i2.200\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Kebijakan Pembangunan","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47441/jkp.v16i2.200","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

公私合作伙伴关系(PPP)是为解决有限的发展预算而发展起来的基础设施项目融资制度。望加锡至帕尔帕尔铁路是交通运输部作为PJPK处理的第一个PPP项目。本文旨在对望加锡-帕累帕工程的准备阶段进行评价。使用的研究方法是描述性定性的。主要数据是通过访谈收集的。所得数据用ATLAS进行分析。ti应用程序。研究结果表明,望加锡-帕累帕项目的PPP准备工作总体上是在规范的基础上进行的。然而,在准备过程中也存在一些障碍,如因土地征用而导致的进度延迟,以及因人力资源准备不足而导致的合作项目负责人的不了解等。因此,在PPP项目的准备过程中,需要良好的组织协调。【摘要】【摘要】【摘要】【摘要】【关键字】【关键字】【关键字】【关键字】【关键字】【关键字】【关键字】【关键字】Salah satu proyek战略国家yang menggunakan skema KPBU saat ini yitu proyek KPBU Kereta Api (KA)望加锡-帕帕雷。图里萨尼·伯尔图安·乌苏尼亚·乌里萨尼·乌里萨尼·乌里萨尼·乌里萨尼·乌里萨尼·乌里萨尼·乌里萨尼·乌里萨尼·乌里萨尼·乌里萨尼·乌里萨尼方法penpentian yang digunakan adalah定性描述。数据引子dikumpulkan melalui将数据引子dikumpulkan melalui下的数据引子dikumpulkan melalui研究中的数据引子和相关的数据引子。数据阳双透光分析,邓安,孟古纳坎,应用atlas . j。makassar - pareparparadumumnya telah dilaksanakan sesuai dengan peraturan yang ada。Meski demikian, terdapat kendala dalam propropenyiapan seperti padaprospetapan trase jalur kereta api yang mengalami kemunduran jadwal karena permasalahan ppenbasan lahan, dan minimnya pemahaman penanggjawab program kerjasama (PJPK) terhadap konsep KPBU。Hal ini terjadi karena proyek KA makassar - pareparemerupakan proyek KPBU pertama yang ditangani oleh Kementerian Perhubungan selaku PJPK, sehinga kesiapan sumber daya manusia dan koordinasi organisasi yang baik sangat diperlukan dalam proses penyapan proyek KPBU kereta api。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluasi Penyiapan Proyek Kerjasama Pemerintah Dengan Badan Usaha (KPBU) Kereta Api Makassar-Parepare
Public-Private Partnership (PPP) is an infrastructure project financing system developed to solve the limited development budget. The Makassar-Parepare railway is the first PPP project handled by the Ministry of Transportation as the PJPK. This paper aims to evaluate the preparation stage of the Makassar-Parepare project. The research method used is descriptive qualitative. Primary data was collected through interviews. The data obtained were analyzed using the ATLAS.ti application. The results of the study indicate that the PPP preparation of the Makassar-Parepare project has generally been well carried out based on regulations. However, there are some obstacles in the preparation process, such as schedule delays due to land acquisition and the lack of understanding of the person in charge of the cooperation program because of unpreparedness of human resources. Thus, good organizational coordination is needed in the preparation process of the PPP project. Abstrak Kerjasama Pemerintah dengan Badan Usaha (KPBU) merupakan suatu sistem pembiayaan proyek infrastruktur yang dikembangkan dalam rangka mengatasi keterbatasan anggaran pembangunan. Salah satu proyek strategis nasional yang menggunakan skema KPBU saat ini yaitu proyek KPBU Kereta Api (KA) Makassar-Parepare. Tulisan ini bertujuan untuk mengevaluasi tahap penyiapan proyek KPBU KA Makassar-Parepare. Metode penelitian yang digunakan adalah kualitatif deskriptif. Data primer dikumpulkan melalui proses wawancara, sedangkan data sekunder dikumpulkan melalui studi pustaka dan peraturan yang relevan dengan objek penelitian. Data yang diperoleh dianalisis dengan menggunakan aplikasi ATLAS.ti. Hasil penelitian menunjukkan bahwa penyiapan proyek KPBU KA Makassar-Parepare pada umumnya telah dilaksanakan sesuai dengan peraturan yang ada. Meski demikian, terdapat kendala dalam proses penyiapan seperti pada proses penetapan trase jalur kereta api yang mengalami kemunduran jadwal karena permasalahan pembebasan lahan, dan minimnya pemahaman penanggungjawab program kerjasama (PJPK) terhadap konsep KPBU. Hal ini terjadi karena proyek KA Makassar-Parepare merupakan proyek KPBU pertama yang ditangani oleh Kementerian Perhubungan selaku PJPK, sehingga kesiapan sumber daya manusia dan koordinasi organisasi yang baik sangat diperlukan dalam proses penyiapan proyek KPBU kereta api.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信