Jian Feng, Yang Pan, Lei Lai, Xianlin Pan, Jiangtao Zhang
{"title":"电感分压器的增量累积校准方法","authors":"Jian Feng, Yang Pan, Lei Lai, Xianlin Pan, Jiangtao Zhang","doi":"10.1109/CPEM49742.2020.9191690","DOIUrl":null,"url":null,"abstract":"An incremental buildup calibration method of inductive voltage divider was introduced, which comprised two steps, the zero voltage measurement procedure and the section voltage measurement procedure. The reference transformer is connected in series with an auxiliary IVD to compare voltage with the output of IVD to be calibrated. The influence of leakage current of both the reference transformer and the detection transformer can be removed by this method.","PeriodicalId":373216,"journal":{"name":"2020 Conference on Precision Electromagnetic Measurements (CPEM)","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Incremental Buildup Calibration Method of Inductive Voltage Divider\",\"authors\":\"Jian Feng, Yang Pan, Lei Lai, Xianlin Pan, Jiangtao Zhang\",\"doi\":\"10.1109/CPEM49742.2020.9191690\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An incremental buildup calibration method of inductive voltage divider was introduced, which comprised two steps, the zero voltage measurement procedure and the section voltage measurement procedure. The reference transformer is connected in series with an auxiliary IVD to compare voltage with the output of IVD to be calibrated. The influence of leakage current of both the reference transformer and the detection transformer can be removed by this method.\",\"PeriodicalId\":373216,\"journal\":{\"name\":\"2020 Conference on Precision Electromagnetic Measurements (CPEM)\",\"volume\":\"44 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 Conference on Precision Electromagnetic Measurements (CPEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CPEM49742.2020.9191690\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 Conference on Precision Electromagnetic Measurements (CPEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPEM49742.2020.9191690","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Incremental Buildup Calibration Method of Inductive Voltage Divider
An incremental buildup calibration method of inductive voltage divider was introduced, which comprised two steps, the zero voltage measurement procedure and the section voltage measurement procedure. The reference transformer is connected in series with an auxiliary IVD to compare voltage with the output of IVD to be calibrated. The influence of leakage current of both the reference transformer and the detection transformer can be removed by this method.