输电网拥塞管理措施的运行顺序分析

Maximilian Schneider, M. Knittel, Andreas Hoffrichter, A. Moser
{"title":"输电网拥塞管理措施的运行顺序分析","authors":"Maximilian Schneider, M. Knittel, Andreas Hoffrichter, A. Moser","doi":"10.1109/ENERGYCon48941.2020.9236478","DOIUrl":null,"url":null,"abstract":"In the research field of power system operation it is common to approximate the considered period of time based on discretized power flow patterns. However, the efficient utilization of the transmission grid infrastructure demands an increasing amount of congestion management measures, such as topology changes via switching measures or adjustments of phase shifting transformers. Transmission system operators must arrange these measures in a decreasing period of time to take account of an increasingly volatile power system. In order to analyze the trajectory between a current and a future grid state, a 2-stage simulation model is proposed. By applying the model to a test system, it is shown that the transition path is highly dependent on the chosen operational sequence, which is defined as the chronological order of operational measures. The mean loading of specific overhead lines during an exemplary transition path differs by up to 50% depending on the chosen operational sequence.","PeriodicalId":156687,"journal":{"name":"2020 6th IEEE International Energy Conference (ENERGYCon)","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Operational Sequences for Congestion Management Measures in Transmission Grids\",\"authors\":\"Maximilian Schneider, M. Knittel, Andreas Hoffrichter, A. Moser\",\"doi\":\"10.1109/ENERGYCon48941.2020.9236478\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the research field of power system operation it is common to approximate the considered period of time based on discretized power flow patterns. However, the efficient utilization of the transmission grid infrastructure demands an increasing amount of congestion management measures, such as topology changes via switching measures or adjustments of phase shifting transformers. Transmission system operators must arrange these measures in a decreasing period of time to take account of an increasingly volatile power system. In order to analyze the trajectory between a current and a future grid state, a 2-stage simulation model is proposed. By applying the model to a test system, it is shown that the transition path is highly dependent on the chosen operational sequence, which is defined as the chronological order of operational measures. The mean loading of specific overhead lines during an exemplary transition path differs by up to 50% depending on the chosen operational sequence.\",\"PeriodicalId\":156687,\"journal\":{\"name\":\"2020 6th IEEE International Energy Conference (ENERGYCon)\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-09-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2020 6th IEEE International Energy Conference (ENERGYCon)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ENERGYCon48941.2020.9236478\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 6th IEEE International Energy Conference (ENERGYCon)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ENERGYCon48941.2020.9236478","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

在电力系统运行研究领域中,常用的方法是基于离散潮流模式来逼近所考虑的时间段。然而,输电网基础设施的有效利用需要越来越多的拥塞管理措施,如通过切换措施或调整移相变压器来改变拓扑结构。输电系统运营商必须将这些措施安排在较短的时间内,以考虑到电力系统日益变化无常的情况。为了分析当前和未来电网状态之间的轨迹,提出了一个两阶段的仿真模型。通过将该模型应用于测试系统,表明了转换路径高度依赖于所选择的操作顺序,该操作顺序被定义为操作措施的时间顺序。在示例性过渡路径期间,特定架空线路的平均负载根据所选择的操作顺序而差异高达50%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Operational Sequences for Congestion Management Measures in Transmission Grids
In the research field of power system operation it is common to approximate the considered period of time based on discretized power flow patterns. However, the efficient utilization of the transmission grid infrastructure demands an increasing amount of congestion management measures, such as topology changes via switching measures or adjustments of phase shifting transformers. Transmission system operators must arrange these measures in a decreasing period of time to take account of an increasingly volatile power system. In order to analyze the trajectory between a current and a future grid state, a 2-stage simulation model is proposed. By applying the model to a test system, it is shown that the transition path is highly dependent on the chosen operational sequence, which is defined as the chronological order of operational measures. The mean loading of specific overhead lines during an exemplary transition path differs by up to 50% depending on the chosen operational sequence.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信