{"title":"不同可靠性重要性措施对传动系统部件优先更换的适用性评估","authors":"S. Awadallah, J. Milanović, Zhongdong Wang, P. Jarman","doi":"10.1109/PTC.2015.7232295","DOIUrl":null,"url":null,"abstract":"The paper presents a comparison of four widely used reliability importance measures in order to identify their appropriateness for the identification of the most critical system components for replacement planning; specifically when using Non-sequential Monte Carlo method. These importance measures are Improvement Potential, Structural Importance, Criticality Importance, and Fussell-Vesely Importance. The four reliability importance measures were calculated for each system component (power transformer in this particular study) and then components were ranked separately based on each measure. Then, the components were replaced, one by one starting from the most critical, to establish the relationship between the replacement according to each ranking and the overall system reliability. The study was performed on a realistic transmission network containing 154 transformers. The results of the paper proved that Improvement Potential is the most appropriate importance measure for replacement planning.","PeriodicalId":193448,"journal":{"name":"2015 IEEE Eindhoven PowerTech","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-09-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Assessment of suitability of different reliability importance measures for prioritising replacement of transmission system components\",\"authors\":\"S. Awadallah, J. Milanović, Zhongdong Wang, P. Jarman\",\"doi\":\"10.1109/PTC.2015.7232295\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents a comparison of four widely used reliability importance measures in order to identify their appropriateness for the identification of the most critical system components for replacement planning; specifically when using Non-sequential Monte Carlo method. These importance measures are Improvement Potential, Structural Importance, Criticality Importance, and Fussell-Vesely Importance. The four reliability importance measures were calculated for each system component (power transformer in this particular study) and then components were ranked separately based on each measure. Then, the components were replaced, one by one starting from the most critical, to establish the relationship between the replacement according to each ranking and the overall system reliability. The study was performed on a realistic transmission network containing 154 transformers. The results of the paper proved that Improvement Potential is the most appropriate importance measure for replacement planning.\",\"PeriodicalId\":193448,\"journal\":{\"name\":\"2015 IEEE Eindhoven PowerTech\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2015-09-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2015 IEEE Eindhoven PowerTech\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PTC.2015.7232295\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 IEEE Eindhoven PowerTech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.2015.7232295","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

本文对四种常用的可靠性重要性度量进行了比较,以确定它们在替换计划中识别最关键系统部件的适用性;特别是当使用非顺序蒙特卡罗方法时。这些重要性度量是改进潜力、结构重要性、临界重要性和富赛尔重要性。计算了每个系统组件(本研究中为电力变压器)的四个可靠性重要性度量,然后根据每个度量分别对组件进行排序。然后,从最关键的部件开始,逐一进行更换,建立按等级更换与系统整体可靠性之间的关系。该研究是在一个包含154台变压器的现实输电网中进行的。结果表明,改进潜力是置换规划中最合适的重要度量。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Assessment of suitability of different reliability importance measures for prioritising replacement of transmission system components
The paper presents a comparison of four widely used reliability importance measures in order to identify their appropriateness for the identification of the most critical system components for replacement planning; specifically when using Non-sequential Monte Carlo method. These importance measures are Improvement Potential, Structural Importance, Criticality Importance, and Fussell-Vesely Importance. The four reliability importance measures were calculated for each system component (power transformer in this particular study) and then components were ranked separately based on each measure. Then, the components were replaced, one by one starting from the most critical, to establish the relationship between the replacement according to each ranking and the overall system reliability. The study was performed on a realistic transmission network containing 154 transformers. The results of the paper proved that Improvement Potential is the most appropriate importance measure for replacement planning.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信