{"title":"尼泊尔的电力:历史、经验和可能性。","authors":"M. R. Kafle","doi":"10.1109/HEP.2007.4510261","DOIUrl":null,"url":null,"abstract":"This article basically indicates the historical perspectives of electric power in Nepal but not limited to this only. The present scenario as well as possibilities in future are also the part of the content. The history of electricity development of Nepal is not so old and has crossed 95 years since the start of construction of Pharping Hydroelctric Plant ( 500 KW) in 1911. Today, Nepal has an electric power of total installed capacity 609 MW in Integrated Power System with the major contribution from 25 numbers of hydroelectric plants. Out of total electric power, about 91 % is contributed from hydroelectric plants and rest of 9 % is supported from diesel plants. The existing largest hydroelectric plant in the country is Kaligandaki-A (144 MW). The generated electric power has been transmitted through 132 KV double circuit transmission line of 2076 km, 66 KV double circuit of 586 km, 66 KV double circuit underground cables of 7 km and 33 KV single circuits of 2485 km within the country. The country has a total sub station capacity of 1089 MVA to date.","PeriodicalId":202728,"journal":{"name":"2007 IEEE Conference on the History of Electric Power","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-01-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"“Electric power in Nepal: History, experiences & possibilities.”\",\"authors\":\"M. R. Kafle\",\"doi\":\"10.1109/HEP.2007.4510261\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This article basically indicates the historical perspectives of electric power in Nepal but not limited to this only. The present scenario as well as possibilities in future are also the part of the content. The history of electricity development of Nepal is not so old and has crossed 95 years since the start of construction of Pharping Hydroelctric Plant ( 500 KW) in 1911. Today, Nepal has an electric power of total installed capacity 609 MW in Integrated Power System with the major contribution from 25 numbers of hydroelectric plants. Out of total electric power, about 91 % is contributed from hydroelectric plants and rest of 9 % is supported from diesel plants. The existing largest hydroelectric plant in the country is Kaligandaki-A (144 MW). The generated electric power has been transmitted through 132 KV double circuit transmission line of 2076 km, 66 KV double circuit of 586 km, 66 KV double circuit underground cables of 7 km and 33 KV single circuits of 2485 km within the country. The country has a total sub station capacity of 1089 MVA to date.\",\"PeriodicalId\":202728,\"journal\":{\"name\":\"2007 IEEE Conference on the History of Electric Power\",\"volume\":\"79 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2007-01-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2007 IEEE Conference on the History of Electric Power\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/HEP.2007.4510261\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE Conference on the History of Electric Power","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/HEP.2007.4510261","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

这篇文章基本上表明了尼泊尔电力的历史观点,但不仅限于此。现在的情景以及未来的可能性也是内容的一部分。尼泊尔的电力发展历史并不悠久,自1911年法平水电站(500千瓦)开始建设以来,已有95年的历史。今天,尼泊尔的综合电力系统总装机容量为609兆瓦,主要来自25个水力发电厂。在总电力中,约91%来自水力发电厂,其余9%来自柴油发电厂。该国目前最大的水力发电厂是Kaligandaki-A(144兆瓦)。已建成132千伏双回输电线路2076公里,66千伏双回输电线路586公里,66千伏双回地下电缆7公里,33千伏单回输电线路2485公里。到目前为止,该国的变电站总容量为1089兆伏安。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
“Electric power in Nepal: History, experiences & possibilities.”
This article basically indicates the historical perspectives of electric power in Nepal but not limited to this only. The present scenario as well as possibilities in future are also the part of the content. The history of electricity development of Nepal is not so old and has crossed 95 years since the start of construction of Pharping Hydroelctric Plant ( 500 KW) in 1911. Today, Nepal has an electric power of total installed capacity 609 MW in Integrated Power System with the major contribution from 25 numbers of hydroelectric plants. Out of total electric power, about 91 % is contributed from hydroelectric plants and rest of 9 % is supported from diesel plants. The existing largest hydroelectric plant in the country is Kaligandaki-A (144 MW). The generated electric power has been transmitted through 132 KV double circuit transmission line of 2076 km, 66 KV double circuit of 586 km, 66 KV double circuit underground cables of 7 km and 33 KV single circuits of 2485 km within the country. The country has a total sub station capacity of 1089 MVA to date.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信