Fraser Murray, K. Wee, Yao Fernand Kouadio, Shardul Parihar, J. Wills
{"title":"ERD井单趟完井技术开发","authors":"Fraser Murray, K. Wee, Yao Fernand Kouadio, Shardul Parihar, J. Wills","doi":"10.2118/211553-ms","DOIUrl":null,"url":null,"abstract":"\n A well operator wanted to maximize operational efficiency for extended-reach drilling (ERD) wells of more than 45,000 ft measured depth (MD) by converting from a two-trip to a single-trip completion solution. A safety valve, field-adjustable polished bore assembly (PBA), and production packer were developed for the single-trip completion design used in both the producer and injector well environments. Strong collaboration between the well operator and completion technology supplier resulted in a tailored technology development and validation program that reduced operational risk as much as reasonably practical. The technology developer achieved several significant technical milestones during the process, which are discussed in more detail. A pre-run computational modelling strategy was developed to manage deployment risks and ensure the technology operated as designed. The analysis performed using this strategy, along with details on how this data is used to configure the technology is also discussed. Track record details are provided to demonstrate successful deployment of the new technology in a live well environment. To date, the operator has successfully deployed three systems in wells between 30,000 and 45,700 ft MD. The well operator and technology supplier continue to collaborate on ongoing and future wells, where the developed system adds significant value.","PeriodicalId":249690,"journal":{"name":"Day 2 Tue, November 01, 2022","volume":"2013 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-10-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Single-Trip Completion Technology Development for ERD Wells\",\"authors\":\"Fraser Murray, K. Wee, Yao Fernand Kouadio, Shardul Parihar, J. Wills\",\"doi\":\"10.2118/211553-ms\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n A well operator wanted to maximize operational efficiency for extended-reach drilling (ERD) wells of more than 45,000 ft measured depth (MD) by converting from a two-trip to a single-trip completion solution. A safety valve, field-adjustable polished bore assembly (PBA), and production packer were developed for the single-trip completion design used in both the producer and injector well environments. Strong collaboration between the well operator and completion technology supplier resulted in a tailored technology development and validation program that reduced operational risk as much as reasonably practical. The technology developer achieved several significant technical milestones during the process, which are discussed in more detail. A pre-run computational modelling strategy was developed to manage deployment risks and ensure the technology operated as designed. The analysis performed using this strategy, along with details on how this data is used to configure the technology is also discussed. Track record details are provided to demonstrate successful deployment of the new technology in a live well environment. To date, the operator has successfully deployed three systems in wells between 30,000 and 45,700 ft MD. The well operator and technology supplier continue to collaborate on ongoing and future wells, where the developed system adds significant value.\",\"PeriodicalId\":249690,\"journal\":{\"name\":\"Day 2 Tue, November 01, 2022\",\"volume\":\"2013 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-10-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, November 01, 2022\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/211553-ms\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, November 01, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/211553-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一家作业者希望将两趟完井方案改为单趟完井方案,以最大限度地提高测量深度超过45000英尺的大位移钻井(ERD)井的作业效率。开发了安全阀、现场可调抛光井眼组合(PBA)和生产封隔器,用于生产井和注入井的单趟完井设计。作业者和完井技术供应商之间的紧密合作,形成了量身定制的技术开发和验证方案,尽可能地降低了操作风险。技术开发人员在此过程中实现了几个重要的技术里程碑,对此将进行更详细的讨论。开发了一种预运行计算建模策略,以管理部署风险并确保技术按设计运行。本文还讨论了使用该策略执行的分析,以及如何使用该数据配置技术的详细信息。提供详细的跟踪记录,以证明新技术在实际井环境中的成功应用。到目前为止,作业者已经在3万~ 45,700英尺的井中成功部署了3套系统。作业者和技术供应商将继续在正在进行和未来的井中合作,开发的系统将为这些井带来巨大的价值。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Single-Trip Completion Technology Development for ERD Wells
A well operator wanted to maximize operational efficiency for extended-reach drilling (ERD) wells of more than 45,000 ft measured depth (MD) by converting from a two-trip to a single-trip completion solution. A safety valve, field-adjustable polished bore assembly (PBA), and production packer were developed for the single-trip completion design used in both the producer and injector well environments. Strong collaboration between the well operator and completion technology supplier resulted in a tailored technology development and validation program that reduced operational risk as much as reasonably practical. The technology developer achieved several significant technical milestones during the process, which are discussed in more detail. A pre-run computational modelling strategy was developed to manage deployment risks and ensure the technology operated as designed. The analysis performed using this strategy, along with details on how this data is used to configure the technology is also discussed. Track record details are provided to demonstrate successful deployment of the new technology in a live well environment. To date, the operator has successfully deployed three systems in wells between 30,000 and 45,700 ft MD. The well operator and technology supplier continue to collaborate on ongoing and future wells, where the developed system adds significant value.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信