{"title":"延长现有输电线路的使用寿命","authors":"M. Ishac, I.F. Boulos, A. Goel, D. Horrocks","doi":"10.1109/TDCLLM.1995.485031","DOIUrl":null,"url":null,"abstract":"The Ontario Hydro Grid System has been built up over the past 89 years and currently consists of 29,000 cct. km (18,000 cct. miles) of 115, 230 and 500 kV lines. Some of the oldest 115 kV lines, constructed in 1906, are still in-service today with most of the original components. By the year 2000, more than one-third of the transmission lines will exceed their 50 year design life. As virtually all these lines are needed indefinitely, they need to be refurbished or replaced to ensure a safe, reliable and economic operation of the transmission line system. The purpose of this paper is to present a process of assessment and evaluation of an existing overhead line and to provide some practical guidelines for life extension of old transmission lines.","PeriodicalId":197796,"journal":{"name":"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-10-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":"{\"title\":\"Life extension of an existing transmission line\",\"authors\":\"M. Ishac, I.F. Boulos, A. Goel, D. Horrocks\",\"doi\":\"10.1109/TDCLLM.1995.485031\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Ontario Hydro Grid System has been built up over the past 89 years and currently consists of 29,000 cct. km (18,000 cct. miles) of 115, 230 and 500 kV lines. Some of the oldest 115 kV lines, constructed in 1906, are still in-service today with most of the original components. By the year 2000, more than one-third of the transmission lines will exceed their 50 year design life. As virtually all these lines are needed indefinitely, they need to be refurbished or replaced to ensure a safe, reliable and economic operation of the transmission line system. The purpose of this paper is to present a process of assessment and evaluation of an existing overhead line and to provide some practical guidelines for life extension of old transmission lines.\",\"PeriodicalId\":197796,\"journal\":{\"name\":\"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1995-10-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"7\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/TDCLLM.1995.485031\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of ESMO'95 - 1995 IEEE 7th International Conference on Transmission and Distribution Construction, Operation and Live-Line Maintenance","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDCLLM.1995.485031","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

摘要

安大略省水力电网系统已经建立了89年,目前由29,000吨组成。千米(18000吨)115、230和500千伏的线路。一些最古老的115千伏线路建于1906年,至今仍在使用大多数原始组件。到2000年,超过三分之一的输电线路将超过其50年的设计寿命。由于几乎所有这些线路都是无限期需要的,因此需要对它们进行翻新或更换,以确保输电线路系统的安全、可靠和经济运行。本文的目的是介绍现有架空线路的评估和评价过程,并为延长旧输电线路的使用寿命提供一些实用的指导方针。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Life extension of an existing transmission line
The Ontario Hydro Grid System has been built up over the past 89 years and currently consists of 29,000 cct. km (18,000 cct. miles) of 115, 230 and 500 kV lines. Some of the oldest 115 kV lines, constructed in 1906, are still in-service today with most of the original components. By the year 2000, more than one-third of the transmission lines will exceed their 50 year design life. As virtually all these lines are needed indefinitely, they need to be refurbished or replaced to ensure a safe, reliable and economic operation of the transmission line system. The purpose of this paper is to present a process of assessment and evaluation of an existing overhead line and to provide some practical guidelines for life extension of old transmission lines.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信