{"title":"调查南非豪登省使用的风险预防和减轻方法来自承包商的证据","authors":"N. Ansary","doi":"10.15224/978-1-63248-154-2-28","DOIUrl":null,"url":null,"abstract":"—This study sought to investigate the effectiveness of risk management methods used in construction projects according to contractor’s perspective. Literature search and questionnaire surveys were carried out, and a total of thirteen risk management actions were identified which were further categorized into two groups of preventive and mitigative actions. Research findings identified subjective judgment to produce a proper programme and production of a proper schedule as mostly used actions to manage risks in the first group. Furthermore, close supervision, increase the working hours and coordinate closely with subcontractors were the most used actions to manage risks in the latter group. The results of this study would considerably boost the understanding of risk management actions and also assist contractors in handling various risks faced by the industry.","PeriodicalId":126283,"journal":{"name":"Eighth International Conference On Advances in Civil Structural and Mechanical Engineering ACSM 2018","volume":"216 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investigating the Risk Preventive and Mitigative Methods used in Gauteng South Africa Evidence from Contractors\",\"authors\":\"N. Ansary\",\"doi\":\"10.15224/978-1-63248-154-2-28\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"—This study sought to investigate the effectiveness of risk management methods used in construction projects according to contractor’s perspective. Literature search and questionnaire surveys were carried out, and a total of thirteen risk management actions were identified which were further categorized into two groups of preventive and mitigative actions. Research findings identified subjective judgment to produce a proper programme and production of a proper schedule as mostly used actions to manage risks in the first group. Furthermore, close supervision, increase the working hours and coordinate closely with subcontractors were the most used actions to manage risks in the latter group. The results of this study would considerably boost the understanding of risk management actions and also assist contractors in handling various risks faced by the industry.\",\"PeriodicalId\":126283,\"journal\":{\"name\":\"Eighth International Conference On Advances in Civil Structural and Mechanical Engineering ACSM 2018\",\"volume\":\"216 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-06-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Eighth International Conference On Advances in Civil Structural and Mechanical Engineering ACSM 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.15224/978-1-63248-154-2-28\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Eighth International Conference On Advances in Civil Structural and Mechanical Engineering ACSM 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15224/978-1-63248-154-2-28","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

-本研究试图从承包商的角度调查建筑项目中使用的风险管理方法的有效性。通过文献检索和问卷调查,共确定了13项风险管理行动,并将其进一步分为预防和缓解两组行动。研究发现,主观判断是制定适当的计划和制定适当的进度表,这是第一组管理风险的主要行动。此外,密切监督、增加工作时间和与分包商密切协调是后者最常用的风险管理措施。这项研究的结果将有助加深对风险管理措施的认识,并协助承办商处理业界面临的各种风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Investigating the Risk Preventive and Mitigative Methods used in Gauteng South Africa Evidence from Contractors
—This study sought to investigate the effectiveness of risk management methods used in construction projects according to contractor’s perspective. Literature search and questionnaire surveys were carried out, and a total of thirteen risk management actions were identified which were further categorized into two groups of preventive and mitigative actions. Research findings identified subjective judgment to produce a proper programme and production of a proper schedule as mostly used actions to manage risks in the first group. Furthermore, close supervision, increase the working hours and coordinate closely with subcontractors were the most used actions to manage risks in the latter group. The results of this study would considerably boost the understanding of risk management actions and also assist contractors in handling various risks faced by the industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信