建设项目的项目交付方法:马来西亚公共部门实践回顾

Mohd Noor. M.I, M. F.A., SB Abd-Karim
{"title":"建设项目的项目交付方法:马来西亚公共部门实践回顾","authors":"Mohd Noor. M.I, M. F.A., SB Abd-Karim","doi":"10.22452/jpmp.vol2no1.1","DOIUrl":null,"url":null,"abstract":"Appropriate project delivery method (PDM) is vital to ensure good performance of construction project. For decades, numerous researches have been conducted to develop a structured and descriptive decision-making framework for selecting an appropriate PDM. However, the adoption of structured and descriptive decision-making in selecting PDM in the construction industry is still understudied, especially in the Malaysian public sector. Thus, this paper attempts to investigate the practices and constraints of the Malaysian public sector in PDM selection for construction projects. This paper adopts an interpretive approach by conducting in-depth literature reviews of the numerous related researches, government policy and guidelines of PDM selection. This paper also assesses the effectiveness of the current PDM selection practices based on previous study findings and reports on PDM performance. Findings indicate that the traditional delivery method is prevalent PDM in most Malaysian public-funded construction projects. The Malaysian public sector has practised authoritarian and prescriptive decision-making governed by the government procurement guidelines in selecting PDM, which intentionally preserves political interests. Inappropriate PDM selection in project execution has produced an unconvincing performance by showing optimism bias on the expected outcome. The Malaysian public sector needs to improve the decision-making process by introducing a structured and descriptive PDM selection framework to derive better outcomes and convincing results. Thus, this paper is significant in improvising the decision-making mechanism in selecting appropriate PDM for the Malaysian public construction project.","PeriodicalId":372443,"journal":{"name":"Journal of Project Management Practice","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Project Delivery Method for Construction Projects: Review of Malaysian Public Sector Practice\",\"authors\":\"Mohd Noor. M.I, M. F.A., SB Abd-Karim\",\"doi\":\"10.22452/jpmp.vol2no1.1\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Appropriate project delivery method (PDM) is vital to ensure good performance of construction project. For decades, numerous researches have been conducted to develop a structured and descriptive decision-making framework for selecting an appropriate PDM. However, the adoption of structured and descriptive decision-making in selecting PDM in the construction industry is still understudied, especially in the Malaysian public sector. Thus, this paper attempts to investigate the practices and constraints of the Malaysian public sector in PDM selection for construction projects. This paper adopts an interpretive approach by conducting in-depth literature reviews of the numerous related researches, government policy and guidelines of PDM selection. This paper also assesses the effectiveness of the current PDM selection practices based on previous study findings and reports on PDM performance. Findings indicate that the traditional delivery method is prevalent PDM in most Malaysian public-funded construction projects. The Malaysian public sector has practised authoritarian and prescriptive decision-making governed by the government procurement guidelines in selecting PDM, which intentionally preserves political interests. Inappropriate PDM selection in project execution has produced an unconvincing performance by showing optimism bias on the expected outcome. The Malaysian public sector needs to improve the decision-making process by introducing a structured and descriptive PDM selection framework to derive better outcomes and convincing results. Thus, this paper is significant in improvising the decision-making mechanism in selecting appropriate PDM for the Malaysian public construction project.\",\"PeriodicalId\":372443,\"journal\":{\"name\":\"Journal of Project Management Practice\",\"volume\":\"15 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Project Management Practice\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22452/jpmp.vol2no1.1\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Project Management Practice","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22452/jpmp.vol2no1.1","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

合适的项目交付方式是保证建设项目良好绩效的关键。几十年来,已经进行了大量的研究,以开发一个结构化和描述性的决策框架,以选择合适的PDM。然而,在建筑行业中选择PDM的结构化和描述性决策的采用仍未得到充分研究,特别是在马来西亚的公共部门。因此,本文试图调查马来西亚公共部门在建筑项目PDM选择中的做法和限制。本文采用解释性的方法,对大量相关研究、政府政策和PDM选择指南进行了深入的文献综述。本文还根据以往的研究结果和关于PDM性能的报告,评估了当前PDM选择实践的有效性。调查结果表明,传统的交付方式是普遍的PDM在大多数马来西亚公共资助的建设项目。马来西亚公共部门在选择PDM时实行了专制和规范的决策,受政府采购指导方针的支配,有意维护政治利益。在项目执行中,不恰当的PDM选择通过对预期结果的乐观偏见产生了不令人信服的表现。马来西亚公共部门需要通过引入结构化和描述性PDM选择框架来改进决策过程,以获得更好的结果和令人信服的结果。因此,本文对完善马来西亚公共建设项目选择合适PDM的决策机制具有重要意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Project Delivery Method for Construction Projects: Review of Malaysian Public Sector Practice
Appropriate project delivery method (PDM) is vital to ensure good performance of construction project. For decades, numerous researches have been conducted to develop a structured and descriptive decision-making framework for selecting an appropriate PDM. However, the adoption of structured and descriptive decision-making in selecting PDM in the construction industry is still understudied, especially in the Malaysian public sector. Thus, this paper attempts to investigate the practices and constraints of the Malaysian public sector in PDM selection for construction projects. This paper adopts an interpretive approach by conducting in-depth literature reviews of the numerous related researches, government policy and guidelines of PDM selection. This paper also assesses the effectiveness of the current PDM selection practices based on previous study findings and reports on PDM performance. Findings indicate that the traditional delivery method is prevalent PDM in most Malaysian public-funded construction projects. The Malaysian public sector has practised authoritarian and prescriptive decision-making governed by the government procurement guidelines in selecting PDM, which intentionally preserves political interests. Inappropriate PDM selection in project execution has produced an unconvincing performance by showing optimism bias on the expected outcome. The Malaysian public sector needs to improve the decision-making process by introducing a structured and descriptive PDM selection framework to derive better outcomes and convincing results. Thus, this paper is significant in improvising the decision-making mechanism in selecting appropriate PDM for the Malaysian public construction project.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信