管理结构风险

D. Blockley
{"title":"管理结构风险","authors":"D. Blockley","doi":"10.1680/STBU.2008.161.4.231","DOIUrl":null,"url":null,"abstract":"Structural engineering has changed markedly over the last decades, creating new challenges and new opportunities. Consequently, structural engineers are widening their thinking from just technical issues to the effects of other matters on the risks to their structures. In particular there is a need to find better methods for integrating hard and soft risks. Hard systems are physical and technical matters traditionally dealt with by engineering science. Soft systems involve people and include matters traditionally dealt with by engineering management. In order to make improvements, engineers have to combine good-quality evidence from disparate sources, both technical and from wider issues. The current paper demonstrates how disparate evidence can be measured and combined using interval probabilities drawn as colourful ‘Italian flag’ indicators of risk. Process models are used to map the progress of projects. An Italian flag is associated with each process to indicate the level of dependability, based on al...","PeriodicalId":340765,"journal":{"name":"Building Bridges","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Managing Risks to Structures\",\"authors\":\"D. Blockley\",\"doi\":\"10.1680/STBU.2008.161.4.231\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Structural engineering has changed markedly over the last decades, creating new challenges and new opportunities. Consequently, structural engineers are widening their thinking from just technical issues to the effects of other matters on the risks to their structures. In particular there is a need to find better methods for integrating hard and soft risks. Hard systems are physical and technical matters traditionally dealt with by engineering science. Soft systems involve people and include matters traditionally dealt with by engineering management. In order to make improvements, engineers have to combine good-quality evidence from disparate sources, both technical and from wider issues. The current paper demonstrates how disparate evidence can be measured and combined using interval probabilities drawn as colourful ‘Italian flag’ indicators of risk. Process models are used to map the progress of projects. An Italian flag is associated with each process to indicate the level of dependability, based on al...\",\"PeriodicalId\":340765,\"journal\":{\"name\":\"Building Bridges\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-08-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Building Bridges\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1680/STBU.2008.161.4.231\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Building Bridges","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1680/STBU.2008.161.4.231","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

在过去的几十年里,结构工程发生了显著的变化,创造了新的挑战和新的机遇。因此,结构工程师正在将他们的思维从单纯的技术问题扩展到其他问题对其结构风险的影响。特别是需要找到更好的方法来整合硬风险和软风险。硬系统是传统上由工程科学处理的物理和技术问题。软系统涉及人,包括传统上由工程管理处理的问题。为了进行改进,工程师必须将来自不同来源的高质量证据结合起来,包括技术和更广泛的问题。当前的论文展示了如何使用区间概率作为彩色的“意大利国旗”风险指标来测量和组合不同的证据。过程模型用于映射项目的进度。一个意大利标志与每个过程相关联,以表明可靠性的水平,基于…
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Managing Risks to Structures
Structural engineering has changed markedly over the last decades, creating new challenges and new opportunities. Consequently, structural engineers are widening their thinking from just technical issues to the effects of other matters on the risks to their structures. In particular there is a need to find better methods for integrating hard and soft risks. Hard systems are physical and technical matters traditionally dealt with by engineering science. Soft systems involve people and include matters traditionally dealt with by engineering management. In order to make improvements, engineers have to combine good-quality evidence from disparate sources, both technical and from wider issues. The current paper demonstrates how disparate evidence can be measured and combined using interval probabilities drawn as colourful ‘Italian flag’ indicators of risk. Process models are used to map the progress of projects. An Italian flag is associated with each process to indicate the level of dependability, based on al...
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信