矩阵结构项目部门阶段重要性评价方法

V. Polyakov, I. Fomicheva, O. Yudina
{"title":"矩阵结构项目部门阶段重要性评价方法","authors":"V. Polyakov, I. Fomicheva, O. Yudina","doi":"10.12737/2587-9111-2023-11-2-55-59","DOIUrl":null,"url":null,"abstract":"An example of the main stages of project management is considered. A variant of the transformation of the organizational structure based on the project of the matrix struc-ture is shown. To harmonize expert assessments, the method of expert competence co-efficients was adopted. The research material makes it possible to assess the signifi-cance or complexity of various projects by stages of implementation. A methodology for expert evaluation of the stages of the matrix structure of project management is proposed. A specific example of project evaluation with numerical data on the sig-nificance of each project by stages of implementation is considered.","PeriodicalId":114770,"journal":{"name":"Scientific Research and Development. Economics","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-05-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Stage Significance Assessment Method Project Departments of Matrix Structure\",\"authors\":\"V. Polyakov, I. Fomicheva, O. Yudina\",\"doi\":\"10.12737/2587-9111-2023-11-2-55-59\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"An example of the main stages of project management is considered. A variant of the transformation of the organizational structure based on the project of the matrix struc-ture is shown. To harmonize expert assessments, the method of expert competence co-efficients was adopted. The research material makes it possible to assess the signifi-cance or complexity of various projects by stages of implementation. A methodology for expert evaluation of the stages of the matrix structure of project management is proposed. A specific example of project evaluation with numerical data on the sig-nificance of each project by stages of implementation is considered.\",\"PeriodicalId\":114770,\"journal\":{\"name\":\"Scientific Research and Development. Economics\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-05-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Research and Development. Economics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.12737/2587-9111-2023-11-2-55-59\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Research and Development. Economics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.12737/2587-9111-2023-11-2-55-59","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

考虑一个项目管理的主要阶段的例子。给出了基于矩阵结构方案的组织结构转换的一种变体。为了协调专家评价,采用了专家能力系数法。研究材料使按实施阶段评估各种项目的重要性或复杂性成为可能。提出了一种对项目管理矩阵结构各阶段进行专家评价的方法。本文考虑了一个具体的项目评价实例,该实例采用数值数据说明了每个项目在实施阶段的重要性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Stage Significance Assessment Method Project Departments of Matrix Structure
An example of the main stages of project management is considered. A variant of the transformation of the organizational structure based on the project of the matrix struc-ture is shown. To harmonize expert assessments, the method of expert competence co-efficients was adopted. The research material makes it possible to assess the signifi-cance or complexity of various projects by stages of implementation. A methodology for expert evaluation of the stages of the matrix structure of project management is proposed. A specific example of project evaluation with numerical data on the sig-nificance of each project by stages of implementation is considered.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信