{"title":"基于BIM技术的装配式钢结构建筑成本优化分析——以A项目为例","authors":"Yi Yang","doi":"10.23977/jceup.2023.050601","DOIUrl":null,"url":null,"abstract":": This paper takes the prefabricated steel structure project (A project for short) in a city as an example to study the cost optimization idea of prefabricated steel structure building based on BIM technology, and further study the cost control points compared with the traditional mode.","PeriodicalId":144072,"journal":{"name":"Journal of Civil Engineering and Urban Planning","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Cost Optimization Analysis of Prefabricated Steel Structure Building Based on BIM Technology—Taking Project A as an Example\",\"authors\":\"Yi Yang\",\"doi\":\"10.23977/jceup.2023.050601\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": This paper takes the prefabricated steel structure project (A project for short) in a city as an example to study the cost optimization idea of prefabricated steel structure building based on BIM technology, and further study the cost control points compared with the traditional mode.\",\"PeriodicalId\":144072,\"journal\":{\"name\":\"Journal of Civil Engineering and Urban Planning\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Civil Engineering and Urban Planning\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.23977/jceup.2023.050601\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering and Urban Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23977/jceup.2023.050601","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Cost Optimization Analysis of Prefabricated Steel Structure Building Based on BIM Technology—Taking Project A as an Example
: This paper takes the prefabricated steel structure project (A project for short) in a city as an example to study the cost optimization idea of prefabricated steel structure building based on BIM technology, and further study the cost control points compared with the traditional mode.