{"title":"更新军事安全关键硬件的挑战","authors":"H. Forsberg","doi":"10.1109/MAES.2010.5592985","DOIUrl":null,"url":null,"abstract":"In this paper, we describe challenges and suggest solutions when upgrading military safety-critical hardware where RTCA/DO-254 never was applied but is required now and not only for application specific integrated circuits (ASICs), programmable logic devices (PLDs), and complex commercial-off-the-shelf (COTS) but for all hardware. Several challenges relate to modification to previously developed hardware resulting from hardware or technology enhancements, or procurement difficulties.","PeriodicalId":313168,"journal":{"name":"2009 IEEE/AIAA 28th Digital Avionics Systems Conference","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-09-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Challenges in updating military safety-critical hardware\",\"authors\":\"H. Forsberg\",\"doi\":\"10.1109/MAES.2010.5592985\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this paper, we describe challenges and suggest solutions when upgrading military safety-critical hardware where RTCA/DO-254 never was applied but is required now and not only for application specific integrated circuits (ASICs), programmable logic devices (PLDs), and complex commercial-off-the-shelf (COTS) but for all hardware. Several challenges relate to modification to previously developed hardware resulting from hardware or technology enhancements, or procurement difficulties.\",\"PeriodicalId\":313168,\"journal\":{\"name\":\"2009 IEEE/AIAA 28th Digital Avionics Systems Conference\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-09-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 IEEE/AIAA 28th Digital Avionics Systems Conference\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MAES.2010.5592985\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE/AIAA 28th Digital Avionics Systems Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MAES.2010.5592985","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Challenges in updating military safety-critical hardware
In this paper, we describe challenges and suggest solutions when upgrading military safety-critical hardware where RTCA/DO-254 never was applied but is required now and not only for application specific integrated circuits (ASICs), programmable logic devices (PLDs), and complex commercial-off-the-shelf (COTS) but for all hardware. Several challenges relate to modification to previously developed hardware resulting from hardware or technology enhancements, or procurement difficulties.