{"title":"津巴布韦布拉瓦约矿业公司(BMC)供水管网系统优化","authors":"T. F. K. Ngoroyemoto, Ashley Ruvimbo Sabao, Knowledge Maganga, Hazel Chibaya","doi":"10.56532/mjsat.v2i3.60","DOIUrl":null,"url":null,"abstract":"Bulawayo Mining Company (BMC) is estimated to lose millions of dollars in potential profit over a period of its documented life of mine (LOM) which is nine years as at May 2019. The projected loss is attributed to the time value of money emanating from the extension of the Life Of Mine due to mining inefficiencies. These inefficiencies are due to poor management of the water management system that plays a key role in the mining cycle. This project was done to make a quantitative analysis of BMC underground water management system in order to establish the bottlenecks and use this knowledge to optimize an efficient Water Reticulation System (WRS). Erratic water supply has an implication of disrupting the mining cycle as most of the operations rely on water; therefore, the supply of water is of great significance. In an effort to resolve the problem of erratic water supply, experiments were conducted to ascertain the quantity of water demanded in contrast with the supply. New Visual basic computer program (WaterCal) that can calculate the optimum WRS parameters as well as simulating real conditions through extrapolation was developed. Algorithm based on fluid mechanics laws and theorems was integrated in the application thereby simplifying the mine design and planning process. It was strongly recommended that the mine should consider using computer solutions in future designs of Water Reticulation Systems such as the WaterCal Windows Application. The pipe size is supposed to be increased from 50mm to 100mm. The mine should also adopt the use of flow meters and pressure gauges to effectively monitor and control the reticulation system effectively.","PeriodicalId":407405,"journal":{"name":"Malaysian Journal of Science and Advanced Technology","volume":"1873 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimization of the Water Reticulation System at Bulawayo Mining Company (BMC), Zimbabwe\",\"authors\":\"T. F. K. Ngoroyemoto, Ashley Ruvimbo Sabao, Knowledge Maganga, Hazel Chibaya\",\"doi\":\"10.56532/mjsat.v2i3.60\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Bulawayo Mining Company (BMC) is estimated to lose millions of dollars in potential profit over a period of its documented life of mine (LOM) which is nine years as at May 2019. The projected loss is attributed to the time value of money emanating from the extension of the Life Of Mine due to mining inefficiencies. These inefficiencies are due to poor management of the water management system that plays a key role in the mining cycle. This project was done to make a quantitative analysis of BMC underground water management system in order to establish the bottlenecks and use this knowledge to optimize an efficient Water Reticulation System (WRS). Erratic water supply has an implication of disrupting the mining cycle as most of the operations rely on water; therefore, the supply of water is of great significance. In an effort to resolve the problem of erratic water supply, experiments were conducted to ascertain the quantity of water demanded in contrast with the supply. New Visual basic computer program (WaterCal) that can calculate the optimum WRS parameters as well as simulating real conditions through extrapolation was developed. Algorithm based on fluid mechanics laws and theorems was integrated in the application thereby simplifying the mine design and planning process. It was strongly recommended that the mine should consider using computer solutions in future designs of Water Reticulation Systems such as the WaterCal Windows Application. The pipe size is supposed to be increased from 50mm to 100mm. The mine should also adopt the use of flow meters and pressure gauges to effectively monitor and control the reticulation system effectively.\",\"PeriodicalId\":407405,\"journal\":{\"name\":\"Malaysian Journal of Science and Advanced Technology\",\"volume\":\"1873 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-08-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Malaysian Journal of Science and Advanced Technology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56532/mjsat.v2i3.60\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Malaysian Journal of Science and Advanced Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56532/mjsat.v2i3.60","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

据估计,布拉瓦约矿业公司(BMC)在其记录在案的矿山寿命(LOM)期间(截至2019年5月为9年)将损失数百万美元的潜在利润。预计的损失是由于采矿效率低下而延长矿山寿命所产生的金钱时间价值。这些低效率是由于在采矿周期中起关键作用的水管理系统管理不善造成的。本项目对BMC地下水管理系统进行了定量分析,以确定瓶颈,并利用这些知识来优化高效的水网系统(WRS)。不稳定的供水意味着破坏采矿周期,因为大多数作业依赖于水;因此,水的供应是非常重要的。为了解决供水不稳定的问题,进行了实验,以确定需水量与供水量的对比。开发了一种新的Visual basic计算机程序WaterCal,可以通过外推法计算WRS的最佳参数并模拟实际情况。应用中融入了基于流体力学定律和定理的算法,简化了矿山设计规划过程。强烈建议该矿在今后的管网系统设计中考虑使用计算机解决方案,如WaterCal Windows应用程序。管道尺寸应该从50mm增加到100mm。矿井还应采用流量计、压力表等手段对管网系统进行有效监测和控制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimization of the Water Reticulation System at Bulawayo Mining Company (BMC), Zimbabwe
Bulawayo Mining Company (BMC) is estimated to lose millions of dollars in potential profit over a period of its documented life of mine (LOM) which is nine years as at May 2019. The projected loss is attributed to the time value of money emanating from the extension of the Life Of Mine due to mining inefficiencies. These inefficiencies are due to poor management of the water management system that plays a key role in the mining cycle. This project was done to make a quantitative analysis of BMC underground water management system in order to establish the bottlenecks and use this knowledge to optimize an efficient Water Reticulation System (WRS). Erratic water supply has an implication of disrupting the mining cycle as most of the operations rely on water; therefore, the supply of water is of great significance. In an effort to resolve the problem of erratic water supply, experiments were conducted to ascertain the quantity of water demanded in contrast with the supply. New Visual basic computer program (WaterCal) that can calculate the optimum WRS parameters as well as simulating real conditions through extrapolation was developed. Algorithm based on fluid mechanics laws and theorems was integrated in the application thereby simplifying the mine design and planning process. It was strongly recommended that the mine should consider using computer solutions in future designs of Water Reticulation Systems such as the WaterCal Windows Application. The pipe size is supposed to be increased from 50mm to 100mm. The mine should also adopt the use of flow meters and pressure gauges to effectively monitor and control the reticulation system effectively.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信