{"title":"通过完成价值程序(AVP)进行项目管理","authors":"Donald J. Aharonian","doi":"10.1109/mark.1979.8817224","DOIUrl":null,"url":null,"abstract":"This paper describes a technique called the Accomplishment Value Procedure, AVP, which accurately measures the status of and provides visibility to an information systems development project. It builds upon the foundation of two of R. I. Benjamin’s axioms: 1","PeriodicalId":341008,"journal":{"name":"1979 International Workshop on Managing Requirements Knowledge (MARK)","volume":"34 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1979-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Project management through the Accomplishment Value Procedure (AVP)\",\"authors\":\"Donald J. Aharonian\",\"doi\":\"10.1109/mark.1979.8817224\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes a technique called the Accomplishment Value Procedure, AVP, which accurately measures the status of and provides visibility to an information systems development project. It builds upon the foundation of two of R. I. Benjamin’s axioms: 1\",\"PeriodicalId\":341008,\"journal\":{\"name\":\"1979 International Workshop on Managing Requirements Knowledge (MARK)\",\"volume\":\"34 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1979-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"1979 International Workshop on Managing Requirements Knowledge (MARK)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/mark.1979.8817224\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"1979 International Workshop on Managing Requirements Knowledge (MARK)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/mark.1979.8817224","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Project management through the Accomplishment Value Procedure (AVP)
This paper describes a technique called the Accomplishment Value Procedure, AVP, which accurately measures the status of and provides visibility to an information systems development project. It builds upon the foundation of two of R. I. Benjamin’s axioms: 1