成功实施ERP: IBM个人系统组经验

I. Becerra-Fernandez, Kenneth E. Murphy, J. Elam
{"title":"成功实施ERP: IBM个人系统组经验","authors":"I. Becerra-Fernandez, Kenneth E. Murphy, J. Elam","doi":"10.1504/IJIEM.2005.007232","DOIUrl":null,"url":null,"abstract":"The Personal Systems Group, a division within IBM, successfully implemented SAP's R/3 enterprise information system in its largest manufacturing facility in North Carolina. The project, at the time the second largest SAP implementation in the world with respect to the number of users, was completed on-time and on-budget. This paper presents an inside look at this large-scale systems implementation: its motivation, the project structure, the complexity of project tasks, the project personnel and the project outcomes. The paper presents six factors that led IBM to a successful implementation: 1. top management commitment; 2. strong project management; 3. team member skills; 4. team member motivation and dedication; 5. effective communication with users; 6. an effectively planned and implemented change management strategy. Evidence of how these factors enabled the Personal Systems Group to successfully achieve the longer-term vision of streamlining their supply chain to increase productivity, cost savings, and customer satisfaction are also presented.","PeriodicalId":218661,"journal":{"name":"Int. J. Internet Enterp. Manag.","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2005-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Successfully implementing ERP: the IBM personal systems group experience\",\"authors\":\"I. Becerra-Fernandez, Kenneth E. Murphy, J. Elam\",\"doi\":\"10.1504/IJIEM.2005.007232\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Personal Systems Group, a division within IBM, successfully implemented SAP's R/3 enterprise information system in its largest manufacturing facility in North Carolina. The project, at the time the second largest SAP implementation in the world with respect to the number of users, was completed on-time and on-budget. This paper presents an inside look at this large-scale systems implementation: its motivation, the project structure, the complexity of project tasks, the project personnel and the project outcomes. The paper presents six factors that led IBM to a successful implementation: 1. top management commitment; 2. strong project management; 3. team member skills; 4. team member motivation and dedication; 5. effective communication with users; 6. an effectively planned and implemented change management strategy. Evidence of how these factors enabled the Personal Systems Group to successfully achieve the longer-term vision of streamlining their supply chain to increase productivity, cost savings, and customer satisfaction are also presented.\",\"PeriodicalId\":218661,\"journal\":{\"name\":\"Int. J. Internet Enterp. Manag.\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2005-06-27\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Int. J. Internet Enterp. Manag.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1504/IJIEM.2005.007232\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Int. J. Internet Enterp. Manag.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/IJIEM.2005.007232","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

IBM旗下的个人系统集团(Personal Systems Group)在其位于北卡罗来纳州的最大制造工厂成功地实施了SAP的R/3企业信息系统。就用户数量而言,该项目是当时世界上第二大的SAP实施,并按时按预算完成。本文介绍了这种大规模系统实施的内部情况:其动机、项目结构、项目任务的复杂性、项目人员和项目成果。本文提出了导致IBM成功实现的六个因素:1。最高管理层的承诺;2. 项目管理能力强;3.团队成员技能;4. 团队成员的积极性和奉献精神;5. 与用户有效沟通;6. 有效计划和实施的变更管理策略。这些因素如何使Personal Systems Group成功地实现其供应链流线化的长期愿景,以提高生产力、成本节约和客户满意度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Successfully implementing ERP: the IBM personal systems group experience
The Personal Systems Group, a division within IBM, successfully implemented SAP's R/3 enterprise information system in its largest manufacturing facility in North Carolina. The project, at the time the second largest SAP implementation in the world with respect to the number of users, was completed on-time and on-budget. This paper presents an inside look at this large-scale systems implementation: its motivation, the project structure, the complexity of project tasks, the project personnel and the project outcomes. The paper presents six factors that led IBM to a successful implementation: 1. top management commitment; 2. strong project management; 3. team member skills; 4. team member motivation and dedication; 5. effective communication with users; 6. an effectively planned and implemented change management strategy. Evidence of how these factors enabled the Personal Systems Group to successfully achieve the longer-term vision of streamlining their supply chain to increase productivity, cost savings, and customer satisfaction are also presented.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信