{"title":"Vega资产新的流动保障策略:管理挪威海底资产长多相管线的水合物和完整性风险","authors":"S. Hatscher, L. Ugueto","doi":"10.2118/195784-MS","DOIUrl":null,"url":null,"abstract":"\n The Vega subsea field in Norway has been producing successfully using a continuous Mono Ethylene Glycol (MEG) injection, topped up with corrosion inhibition means. A topside reclamation process allows re-use of MEG, however, limits the possibilities to produce saline water. In order to manage wells producing saline formation water and to increase ultimate recovery, a new flow assurance and integrity philosophy without continuous MEG injection is considered. This paper describes the options on hydrate as well as integrity management and the modifications both on the subsea and topside facilities required to enable an operational philosophy change. This change of the operational philosophy appears feasible, using either timely depressurization or Low Dosage Hydrate Inhibitors (LDHI) as well as a film building corrosion inhibitor in the system.","PeriodicalId":332235,"journal":{"name":"Day 4 Fri, September 06, 2019","volume":"56 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-03","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"A New Flow Assurance Strategy for the Vega Asset: Managing Hydrate and Integrity Risks on a Long Multiphase Flowline of a Norwegian Subsea Asset\",\"authors\":\"S. Hatscher, L. Ugueto\",\"doi\":\"10.2118/195784-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n The Vega subsea field in Norway has been producing successfully using a continuous Mono Ethylene Glycol (MEG) injection, topped up with corrosion inhibition means. A topside reclamation process allows re-use of MEG, however, limits the possibilities to produce saline water. In order to manage wells producing saline formation water and to increase ultimate recovery, a new flow assurance and integrity philosophy without continuous MEG injection is considered. This paper describes the options on hydrate as well as integrity management and the modifications both on the subsea and topside facilities required to enable an operational philosophy change. This change of the operational philosophy appears feasible, using either timely depressurization or Low Dosage Hydrate Inhibitors (LDHI) as well as a film building corrosion inhibitor in the system.\",\"PeriodicalId\":332235,\"journal\":{\"name\":\"Day 4 Fri, September 06, 2019\",\"volume\":\"56 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-09-03\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 4 Fri, September 06, 2019\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/195784-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 4 Fri, September 06, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/195784-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A New Flow Assurance Strategy for the Vega Asset: Managing Hydrate and Integrity Risks on a Long Multiphase Flowline of a Norwegian Subsea Asset
The Vega subsea field in Norway has been producing successfully using a continuous Mono Ethylene Glycol (MEG) injection, topped up with corrosion inhibition means. A topside reclamation process allows re-use of MEG, however, limits the possibilities to produce saline water. In order to manage wells producing saline formation water and to increase ultimate recovery, a new flow assurance and integrity philosophy without continuous MEG injection is considered. This paper describes the options on hydrate as well as integrity management and the modifications both on the subsea and topside facilities required to enable an operational philosophy change. This change of the operational philosophy appears feasible, using either timely depressurization or Low Dosage Hydrate Inhibitors (LDHI) as well as a film building corrosion inhibitor in the system.