电力系统恢复过程中发电机启动顺序的一种新解决方案

Qiang Liu, Libao Shi, Ming Zhou, Gengyin Li, Y. Ni
{"title":"电力系统恢复过程中发电机启动顺序的一种新解决方案","authors":"Qiang Liu, Libao Shi, Ming Zhou, Gengyin Li, Y. Ni","doi":"10.1109/DRPT.2008.4523894","DOIUrl":null,"url":null,"abstract":"Optimal generators start-up strategy in the restorative control of a power system following a blackout is a complex, multi-stage decision optimization problem. A novel solution strategy involving the corresponding model and approach to this problem is presented in this paper. The aim of the method is to maximize the total MWh load served over a restoration period whilst considering the corresponding constraints. The proposed model is first discretized as a series of knapsack problems with respect to each time step. The classic backtracking search method is employed to solve those knapsack problems. Moreover, the optimal generators start-up solution procedure is illustrated as well. The proposed method, to some extent, can make the trade off between the simulation precision and the computing efforts better. Case studies based on a modified 15-generator test system as benchmark are carried out to demonstrate the effectiveness and validity of the proposed model and method.","PeriodicalId":240420,"journal":{"name":"2008 Third International Conference on Electric Utility Deregulation and Restructuring and Power Technologies","volume":"45 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-04-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"17","resultStr":"{\"title\":\"A new solution to generators start-up sequence during power system restoration\",\"authors\":\"Qiang Liu, Libao Shi, Ming Zhou, Gengyin Li, Y. Ni\",\"doi\":\"10.1109/DRPT.2008.4523894\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Optimal generators start-up strategy in the restorative control of a power system following a blackout is a complex, multi-stage decision optimization problem. A novel solution strategy involving the corresponding model and approach to this problem is presented in this paper. The aim of the method is to maximize the total MWh load served over a restoration period whilst considering the corresponding constraints. The proposed model is first discretized as a series of knapsack problems with respect to each time step. The classic backtracking search method is employed to solve those knapsack problems. Moreover, the optimal generators start-up solution procedure is illustrated as well. The proposed method, to some extent, can make the trade off between the simulation precision and the computing efforts better. Case studies based on a modified 15-generator test system as benchmark are carried out to demonstrate the effectiveness and validity of the proposed model and method.\",\"PeriodicalId\":240420,\"journal\":{\"name\":\"2008 Third International Conference on Electric Utility Deregulation and Restructuring and Power Technologies\",\"volume\":\"45 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-04-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"17\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 Third International Conference on Electric Utility Deregulation and Restructuring and Power Technologies\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/DRPT.2008.4523894\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 Third International Conference on Electric Utility Deregulation and Restructuring and Power Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2008.4523894","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 17

摘要

停电后电力系统恢复控制中发电机最优启动策略是一个复杂的多阶段决策优化问题。本文提出了一种新的求解策略,包括相应的模型和方法。该方法的目的是在考虑相应约束的同时,最大限度地提高在恢复期间服务的总兆瓦时负荷。该模型首先对每个时间步长离散为一系列背包问题。采用经典的回溯搜索方法求解这类背包问题。并给出了发电机最优启动求解过程。该方法在一定程度上能较好地平衡仿真精度和计算量。以改进后的15台发电机测试系统为例,验证了所提模型和方法的有效性和有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A new solution to generators start-up sequence during power system restoration
Optimal generators start-up strategy in the restorative control of a power system following a blackout is a complex, multi-stage decision optimization problem. A novel solution strategy involving the corresponding model and approach to this problem is presented in this paper. The aim of the method is to maximize the total MWh load served over a restoration period whilst considering the corresponding constraints. The proposed model is first discretized as a series of knapsack problems with respect to each time step. The classic backtracking search method is employed to solve those knapsack problems. Moreover, the optimal generators start-up solution procedure is illustrated as well. The proposed method, to some extent, can make the trade off between the simulation precision and the computing efforts better. Case studies based on a modified 15-generator test system as benchmark are carried out to demonstrate the effectiveness and validity of the proposed model and method.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信