FITL系统对现有和新服务要求的演变

C.A. Personick, H.R. Salloum, M. Seely
{"title":"FITL系统对现有和新服务要求的演变","authors":"C.A. Personick, H.R. Salloum, M. Seely","doi":"10.1109/OHAN.1993.587693","DOIUrl":null,"url":null,"abstract":"At the end of 1990, a Technical Advisory, TA-NWT-000909, Issue 1, Generic Requirements and Objectives for Fiber in the Loop (FITL) Systems was issued. Bellcore is planning a release a second issue of TA-909. The two primary drivers for the planned re-issue of TA-909 are to improve existing requirements that may permit more cost-effective delivery of existing services and to provide initial requirements that enable upgrade of TR-909 systems for the transport of higher bandwidth services. The pending additions and changes that are currently being socialized within the industry, Bellcore and BCCs are outlined. Some of the key technical areas discussed include a more cost-effective platform for the delivery of existing telecommunications services, powering, the interrelationship between SONET (synchronous optical network), IDLC and FITL technologies, the changing transmission and operations environment impacting FITL system deployment, and higher bandwidth service capabilities and performance. The requirements evolution for existing telecommunications services is also discussed.","PeriodicalId":104930,"journal":{"name":"Proceedings of 5th Conference on Optical Hybrid Access Networks","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-09-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evolution of FITL system requirements for existing and new services\",\"authors\":\"C.A. Personick, H.R. Salloum, M. Seely\",\"doi\":\"10.1109/OHAN.1993.587693\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"At the end of 1990, a Technical Advisory, TA-NWT-000909, Issue 1, Generic Requirements and Objectives for Fiber in the Loop (FITL) Systems was issued. Bellcore is planning a release a second issue of TA-909. The two primary drivers for the planned re-issue of TA-909 are to improve existing requirements that may permit more cost-effective delivery of existing services and to provide initial requirements that enable upgrade of TR-909 systems for the transport of higher bandwidth services. The pending additions and changes that are currently being socialized within the industry, Bellcore and BCCs are outlined. Some of the key technical areas discussed include a more cost-effective platform for the delivery of existing telecommunications services, powering, the interrelationship between SONET (synchronous optical network), IDLC and FITL technologies, the changing transmission and operations environment impacting FITL system deployment, and higher bandwidth service capabilities and performance. The requirements evolution for existing telecommunications services is also discussed.\",\"PeriodicalId\":104930,\"journal\":{\"name\":\"Proceedings of 5th Conference on Optical Hybrid Access Networks\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1993-09-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of 5th Conference on Optical Hybrid Access Networks\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/OHAN.1993.587693\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of 5th Conference on Optical Hybrid Access Networks","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/OHAN.1993.587693","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

1990年底,印发了技术咨询文件TA-NWT-000909,第1期,环路内光纤系统的一般要求和目标。Bellcore正计划发布第二版TA-909。计划重新发布TA-909的两个主要驱动因素是改进现有要求,使现有服务的交付更具成本效益,并提供初步要求,使TR-909系统能够升级,以传输更高带宽的服务。即将到来的增加和变化,目前正在行业内社会化,Bellcore和bcc概述。讨论的一些关键技术领域包括为现有电信服务提供更具成本效益的平台、供电、SONET(同步光网络)、IDLC和FITL技术之间的相互关系、影响FITL系统部署的不断变化的传输和操作环境,以及更高的带宽服务能力和性能。讨论了现有电信业务的需求演变。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evolution of FITL system requirements for existing and new services
At the end of 1990, a Technical Advisory, TA-NWT-000909, Issue 1, Generic Requirements and Objectives for Fiber in the Loop (FITL) Systems was issued. Bellcore is planning a release a second issue of TA-909. The two primary drivers for the planned re-issue of TA-909 are to improve existing requirements that may permit more cost-effective delivery of existing services and to provide initial requirements that enable upgrade of TR-909 systems for the transport of higher bandwidth services. The pending additions and changes that are currently being socialized within the industry, Bellcore and BCCs are outlined. Some of the key technical areas discussed include a more cost-effective platform for the delivery of existing telecommunications services, powering, the interrelationship between SONET (synchronous optical network), IDLC and FITL technologies, the changing transmission and operations environment impacting FITL system deployment, and higher bandwidth service capabilities and performance. The requirements evolution for existing telecommunications services is also discussed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信