软件测试评估工具:可与COCOMOII模型相媲美

Shaiful Islam, B. B. Pathik, Manzur H. Khan, M. Habib
{"title":"软件测试评估工具:可与COCOMOII模型相媲美","authors":"Shaiful Islam, B. B. Pathik, Manzur H. Khan, M. Habib","doi":"10.1109/IEEM.2016.7797865","DOIUrl":null,"url":null,"abstract":"This study illustrates an estimation tool for software test that provides the estimated time and the cost of any sort of software test project. There are different well-recognized estimation tools for software development process [9], however, there remains a lack of standard tools for estimation of Software Test phase. Therefore, the authors developed a web base tool (www.4beats.net/tpet/) in order to determine the time and cost of projects. This paper highlights the comparable result with COCOMOII (Constructive Cost Model) model. More than 22 projects are already estimated by this open tool and from them 5 case projects, namely, Climate Resilient Ecosystems and Livelihood (CREL), Management Accounts Consolidation System for Line Director (LDMACS), PBI (Police Bureau of Investigations) Works Management System Software, PBI Mobile Apps and Human Resources Management System (HRMS) have selected. This paper would play a vital role to estimate time and cost for software test project and be beneficial for the software industry.","PeriodicalId":114906,"journal":{"name":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":"{\"title\":\"Software test estimation tool: Comparable with COCOMOII model\",\"authors\":\"Shaiful Islam, B. B. Pathik, Manzur H. Khan, M. Habib\",\"doi\":\"10.1109/IEEM.2016.7797865\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study illustrates an estimation tool for software test that provides the estimated time and the cost of any sort of software test project. There are different well-recognized estimation tools for software development process [9], however, there remains a lack of standard tools for estimation of Software Test phase. Therefore, the authors developed a web base tool (www.4beats.net/tpet/) in order to determine the time and cost of projects. This paper highlights the comparable result with COCOMOII (Constructive Cost Model) model. More than 22 projects are already estimated by this open tool and from them 5 case projects, namely, Climate Resilient Ecosystems and Livelihood (CREL), Management Accounts Consolidation System for Line Director (LDMACS), PBI (Police Bureau of Investigations) Works Management System Software, PBI Mobile Apps and Human Resources Management System (HRMS) have selected. This paper would play a vital role to estimate time and cost for software test project and be beneficial for the software industry.\",\"PeriodicalId\":114906,\"journal\":{\"name\":\"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"volume\":\"26 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"3\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEEM.2016.7797865\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEEM.2016.7797865","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

摘要

这个研究说明了一个软件测试的估计工具,它提供了任何类型的软件测试项目的估计时间和成本。对于软件开发过程有不同的公认的评估工具[9],但是对于软件测试阶段的评估仍然缺乏标准的工具。因此,作者开发了一个基于web的工具(www.4beats.net/tpet/),以确定项目的时间和成本。本文重点介绍了与COCOMOII (construction Cost Model)模型的比较结果。这个开放工具已经评估了超过22个项目,并从其中选择了5个案例项目,即气候适应型生态系统和生计(CREL),部门主管管理账户合并系统(LDMACS), PBI(警察调查局)工作管理系统软件,PBI移动应用程序和人力资源管理系统(HRMS)。本文将对软件测试项目的时间和成本估算起到重要的作用,对软件行业有一定的借鉴意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Software test estimation tool: Comparable with COCOMOII model
This study illustrates an estimation tool for software test that provides the estimated time and the cost of any sort of software test project. There are different well-recognized estimation tools for software development process [9], however, there remains a lack of standard tools for estimation of Software Test phase. Therefore, the authors developed a web base tool (www.4beats.net/tpet/) in order to determine the time and cost of projects. This paper highlights the comparable result with COCOMOII (Constructive Cost Model) model. More than 22 projects are already estimated by this open tool and from them 5 case projects, namely, Climate Resilient Ecosystems and Livelihood (CREL), Management Accounts Consolidation System for Line Director (LDMACS), PBI (Police Bureau of Investigations) Works Management System Software, PBI Mobile Apps and Human Resources Management System (HRMS) have selected. This paper would play a vital role to estimate time and cost for software test project and be beneficial for the software industry.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信