{"title":"一种提高多引擎BPM系统效率的自适应调度程序","authors":"Junyi Sun, Houfu Li, Yanbo Han","doi":"10.1109/ISPA.2009.78","DOIUrl":null,"url":null,"abstract":"Process enactment plays a pivotal role in BPM systems. In order to enhance the scalability and robustness of BPM systems, a straightforward solution is to provide a redundant system with multi-engine architecture. However, without an effective scheduler, the multi-engine BPM systems cannot play out its advantages. This paper focuses on the design of an adaptive scheduler which can handle both process-level and activity-level scheduling based on dynamic weighted scheduling algorithm. The experiments show that, with the scheduler, the load capacity of the multi-engine BPM system can be improved and the average response time of process requests can be reduced, especially when each engine node has some differences in configurations.","PeriodicalId":346815,"journal":{"name":"2009 IEEE International Symposium on Parallel and Distributed Processing with Applications","volume":"76 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-08-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"An Adaptive Scheduler for Enhancing the Efficiency of Multi-engine BPM Systems\",\"authors\":\"Junyi Sun, Houfu Li, Yanbo Han\",\"doi\":\"10.1109/ISPA.2009.78\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Process enactment plays a pivotal role in BPM systems. In order to enhance the scalability and robustness of BPM systems, a straightforward solution is to provide a redundant system with multi-engine architecture. However, without an effective scheduler, the multi-engine BPM systems cannot play out its advantages. This paper focuses on the design of an adaptive scheduler which can handle both process-level and activity-level scheduling based on dynamic weighted scheduling algorithm. The experiments show that, with the scheduler, the load capacity of the multi-engine BPM system can be improved and the average response time of process requests can be reduced, especially when each engine node has some differences in configurations.\",\"PeriodicalId\":346815,\"journal\":{\"name\":\"2009 IEEE International Symposium on Parallel and Distributed Processing with Applications\",\"volume\":\"76 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-08-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2009 IEEE International Symposium on Parallel and Distributed Processing with Applications\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISPA.2009.78\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE International Symposium on Parallel and Distributed Processing with Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISPA.2009.78","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
An Adaptive Scheduler for Enhancing the Efficiency of Multi-engine BPM Systems
Process enactment plays a pivotal role in BPM systems. In order to enhance the scalability and robustness of BPM systems, a straightforward solution is to provide a redundant system with multi-engine architecture. However, without an effective scheduler, the multi-engine BPM systems cannot play out its advantages. This paper focuses on the design of an adaptive scheduler which can handle both process-level and activity-level scheduling based on dynamic weighted scheduling algorithm. The experiments show that, with the scheduler, the load capacity of the multi-engine BPM system can be improved and the average response time of process requests can be reduced, especially when each engine node has some differences in configurations.