{"title":"机械盾构掘进中的建筑信息模型——实践者对不久将来的展望","authors":"J. Stascheit, J. Ninić, G. Meschke, F. Hegemann, U. Maidl","doi":"10.1002/geot.201700060","DOIUrl":null,"url":null,"abstract":"The contribution takes a glance at the application of BIM technologies in the design and construction phases of shield tunnelling projects. The intention is to show how Building Information Modelling can be translated into actual benefit, not only in the operation phase but also in the design and construction phases of bored tunnels. Emphasising the integrative character of referencing data uniformly in space and time, examples are given of seamless communication between 3D geometrical modelling, efficient numerical simulation and model adaptation based on measured data acquired during the boring process. The article covers the complete range from predesign through structural analysis and detailed design until the actual excavation process including its interactions with the environment. Special emphasis is given to data management, which is the key to transforming a mere 3D visualisation into a Building Information Model. The article therefore presents a concept for database‐supported, web‐based integration of software modules for geometrical modelling in various levels of detail, efficient numerical simulation tools that are based upon this representation, and process controlling that manages all data acquired during the construction process in a spatially and temporally coordinated reference system.","PeriodicalId":170042,"journal":{"name":"Geomechanics and Tunnelling","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-02-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":"{\"title\":\"Building Information Modelling in mechanised shield tunnelling – A practitioner's outlook to the near future\",\"authors\":\"J. Stascheit, J. Ninić, G. Meschke, F. Hegemann, U. Maidl\",\"doi\":\"10.1002/geot.201700060\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The contribution takes a glance at the application of BIM technologies in the design and construction phases of shield tunnelling projects. The intention is to show how Building Information Modelling can be translated into actual benefit, not only in the operation phase but also in the design and construction phases of bored tunnels. Emphasising the integrative character of referencing data uniformly in space and time, examples are given of seamless communication between 3D geometrical modelling, efficient numerical simulation and model adaptation based on measured data acquired during the boring process. The article covers the complete range from predesign through structural analysis and detailed design until the actual excavation process including its interactions with the environment. Special emphasis is given to data management, which is the key to transforming a mere 3D visualisation into a Building Information Model. The article therefore presents a concept for database‐supported, web‐based integration of software modules for geometrical modelling in various levels of detail, efficient numerical simulation tools that are based upon this representation, and process controlling that manages all data acquired during the construction process in a spatially and temporally coordinated reference system.\",\"PeriodicalId\":170042,\"journal\":{\"name\":\"Geomechanics and Tunnelling\",\"volume\":\"11 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-02-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"9\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Geomechanics and Tunnelling\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1002/geot.201700060\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanics and Tunnelling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/geot.201700060","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9

摘要

该贡献概述了BIM技术在盾构隧道项目设计和施工阶段的应用。目的是展示如何将建筑信息模型转化为实际效益,不仅在运营阶段,而且在钻孔隧道的设计和施工阶段。强调参考数据在空间和时间上的一致性,给出了三维几何建模、高效数值模拟和基于钻孔过程中获得的测量数据的模型自适应之间无缝通信的实例。文章涵盖了从前期设计到结构分析和详细设计,直到实际挖掘过程及其与环境的相互作用的完整范围。特别强调数据管理,这是将单纯的3D可视化转变为建筑信息模型的关键。因此,本文提出了一个基于数据库的概念,基于网络的集成软件模块,用于各种细节层次的几何建模,基于这种表示的高效数值模拟工具,以及在空间和时间协调的参考系统中管理施工过程中获得的所有数据的过程控制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Building Information Modelling in mechanised shield tunnelling – A practitioner's outlook to the near future
The contribution takes a glance at the application of BIM technologies in the design and construction phases of shield tunnelling projects. The intention is to show how Building Information Modelling can be translated into actual benefit, not only in the operation phase but also in the design and construction phases of bored tunnels. Emphasising the integrative character of referencing data uniformly in space and time, examples are given of seamless communication between 3D geometrical modelling, efficient numerical simulation and model adaptation based on measured data acquired during the boring process. The article covers the complete range from predesign through structural analysis and detailed design until the actual excavation process including its interactions with the environment. Special emphasis is given to data management, which is the key to transforming a mere 3D visualisation into a Building Information Model. The article therefore presents a concept for database‐supported, web‐based integration of software modules for geometrical modelling in various levels of detail, efficient numerical simulation tools that are based upon this representation, and process controlling that manages all data acquired during the construction process in a spatially and temporally coordinated reference system.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信