{"title":"通过内部和精益设计解锁生产设备中的石油生产,显著节省成本","authors":"Auttapon Rungchaya, Pimpisa Pechvijitra, Arak Yongchooyot, Kantkanit Watanakun, Saranee Nitayaphan, Anoma Chutrapukdeekul","doi":"10.2523/iptc-22732-ea","DOIUrl":null,"url":null,"abstract":"\n \n \n Currently, the crude oil from outstations (O/STN) wellsite contributes more than 30% of the total Sirikit Oilfileds (S1) production and will be increased to 50% of total production of Sirikit Oilfileds. According to the production profile of the NTM-A areas, NTM-A Onshore permanent production facilities are more likely to handle the higher gross production rate to up 20,000 BPD. Thus, it is essential to debottleneck NTM-A to handle the new gross production rate.\n \n \n \n The existing capacity of NTM-A permanent production facilities is 13,000 BPD. In order to debottleneck NTM-A's capacity to 20,000 BPD, the capacities of the production separators, the indirect gas fired heaters, the storage tanks, the water injection system, and the utilities were re-verified at different percent water cuts. To minimize the project cost, all of new equipment was designed by our in-house engineering team. Lessons learned from the previous projects were taken into account and incorporated with the new design.\n","PeriodicalId":283978,"journal":{"name":"Day 1 Wed, March 01, 2023","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-02-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Unlock Oil Production in Production Facility by in House and Lean Design with Significant Cost Saving\",\"authors\":\"Auttapon Rungchaya, Pimpisa Pechvijitra, Arak Yongchooyot, Kantkanit Watanakun, Saranee Nitayaphan, Anoma Chutrapukdeekul\",\"doi\":\"10.2523/iptc-22732-ea\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"\\n \\n \\n Currently, the crude oil from outstations (O/STN) wellsite contributes more than 30% of the total Sirikit Oilfileds (S1) production and will be increased to 50% of total production of Sirikit Oilfileds. According to the production profile of the NTM-A areas, NTM-A Onshore permanent production facilities are more likely to handle the higher gross production rate to up 20,000 BPD. Thus, it is essential to debottleneck NTM-A to handle the new gross production rate.\\n \\n \\n \\n The existing capacity of NTM-A permanent production facilities is 13,000 BPD. In order to debottleneck NTM-A's capacity to 20,000 BPD, the capacities of the production separators, the indirect gas fired heaters, the storage tanks, the water injection system, and the utilities were re-verified at different percent water cuts. To minimize the project cost, all of new equipment was designed by our in-house engineering team. Lessons learned from the previous projects were taken into account and incorporated with the new design.\\n\",\"PeriodicalId\":283978,\"journal\":{\"name\":\"Day 1 Wed, March 01, 2023\",\"volume\":\"13 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-02-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 1 Wed, March 01, 2023\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2523/iptc-22732-ea\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Wed, March 01, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2523/iptc-22732-ea","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目前,来自外站(O/STN)井场的原油贡献了诗丽吉油田(S1)总产量的30%以上,并将增加到诗丽吉油田总产量的50%。根据NTM-A地区的生产概况,NTM-A陆上永久性生产设施更有可能处理高达2万桶/天的总产量。因此,有必要对NTM-A进行去瓶颈化处理,以处理新的总生产率。NTM-A永久生产设施的现有产能为13000桶/天。为了将NTM-A的产能提高到20000桶/天,生产分离器、间接燃气加热器、储罐、注水系统和公用设施的产能在不同含水率下进行了重新验证。为了最大限度地降低项目成本,所有新设备都是由我们的内部工程团队设计的。从以前的项目中吸取的经验教训被考虑并融入到新的设计中。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Unlock Oil Production in Production Facility by in House and Lean Design with Significant Cost Saving
Currently, the crude oil from outstations (O/STN) wellsite contributes more than 30% of the total Sirikit Oilfileds (S1) production and will be increased to 50% of total production of Sirikit Oilfileds. According to the production profile of the NTM-A areas, NTM-A Onshore permanent production facilities are more likely to handle the higher gross production rate to up 20,000 BPD. Thus, it is essential to debottleneck NTM-A to handle the new gross production rate. The existing capacity of NTM-A permanent production facilities is 13,000 BPD. In order to debottleneck NTM-A's capacity to 20,000 BPD, the capacities of the production separators, the indirect gas fired heaters, the storage tanks, the water injection system, and the utilities were re-verified at different percent water cuts. To minimize the project cost, all of new equipment was designed by our in-house engineering team. Lessons learned from the previous projects were taken into account and incorporated with the new design.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信