{"title":"最坏情况下执行时间分析中的障碍","authors":"R. Kirner, P. Puschner","doi":"10.1109/ISORC.2008.65","DOIUrl":null,"url":null,"abstract":"The analysis of the worst-case execution time (WCET) requires detailed knowledge of the program behavior. In practice it is still not possible to obtain all needed information automatically. In this paper we present the current state of the art of WCET analysis and point to the main problems to be solved. The most eminent problem is the state problem, i.e., the precise determination of possible processor states at different program locations. The path problem refers to the fact that current tools are not able to calculate all (in)feasible paths automatically. We discuss how the main open problems manifest themselves in static and in measurement-based WCET analysis methods.","PeriodicalId":378715,"journal":{"name":"2008 11th IEEE International Symposium on Object and Component-Oriented Real-Time Distributed Computing (ISORC)","volume":"37 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-05-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"67","resultStr":"{\"title\":\"Obstacles in Worst-Case Execution Time Analysis\",\"authors\":\"R. Kirner, P. Puschner\",\"doi\":\"10.1109/ISORC.2008.65\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The analysis of the worst-case execution time (WCET) requires detailed knowledge of the program behavior. In practice it is still not possible to obtain all needed information automatically. In this paper we present the current state of the art of WCET analysis and point to the main problems to be solved. The most eminent problem is the state problem, i.e., the precise determination of possible processor states at different program locations. The path problem refers to the fact that current tools are not able to calculate all (in)feasible paths automatically. We discuss how the main open problems manifest themselves in static and in measurement-based WCET analysis methods.\",\"PeriodicalId\":378715,\"journal\":{\"name\":\"2008 11th IEEE International Symposium on Object and Component-Oriented Real-Time Distributed Computing (ISORC)\",\"volume\":\"37 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2008-05-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"67\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2008 11th IEEE International Symposium on Object and Component-Oriented Real-Time Distributed Computing (ISORC)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISORC.2008.65\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 11th IEEE International Symposium on Object and Component-Oriented Real-Time Distributed Computing (ISORC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISORC.2008.65","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 67

摘要

对最坏情况执行时间(WCET)的分析需要详细了解程序行为。在实践中,仍然不可能自动获得所有需要的信息。本文介绍了WCET分析的现状,并指出了需要解决的主要问题。最突出的问题是状态问题,即在不同程序位置精确确定可能的处理器状态。路径问题是指当前的工具不能自动计算出所有可行的路径。我们讨论了在静态和基于测量的WCET分析方法中主要的开放性问题是如何表现出来的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Obstacles in Worst-Case Execution Time Analysis
The analysis of the worst-case execution time (WCET) requires detailed knowledge of the program behavior. In practice it is still not possible to obtain all needed information automatically. In this paper we present the current state of the art of WCET analysis and point to the main problems to be solved. The most eminent problem is the state problem, i.e., the precise determination of possible processor states at different program locations. The path problem refers to the fact that current tools are not able to calculate all (in)feasible paths automatically. We discuss how the main open problems manifest themselves in static and in measurement-based WCET analysis methods.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信