{"title":"低压电网的设计与工程应用","authors":"Yi Zhu, Lu Chen, Yimu Fu, Hao Zhang, Guangfeng Zhao","doi":"10.1109/ICPEA56363.2022.10052476","DOIUrl":null,"url":null,"abstract":"As the end of the whole distribution network, low voltage power grid still has many deficiencies and problems that need to be further strengthened and solved. In the planning and design of low voltage power grid, offset to the distribution transformer (load center), power supply distance, tortuosity coefficient of path, terminal voltage drop, length of single-phase power supply line, length/ section of meter backline, etc. are all indicators to be considered. Moreover, we should not only ensure scientificity and rationality of the low voltage power grid construction design scheme, but also apply informatization means and intelligent software to improve accuracy of design and efficiency of construction.","PeriodicalId":447871,"journal":{"name":"2022 5th International Conference on Power and Energy Applications (ICPEA)","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Design and Engineering Application of Low Voltage Power Grid\",\"authors\":\"Yi Zhu, Lu Chen, Yimu Fu, Hao Zhang, Guangfeng Zhao\",\"doi\":\"10.1109/ICPEA56363.2022.10052476\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As the end of the whole distribution network, low voltage power grid still has many deficiencies and problems that need to be further strengthened and solved. In the planning and design of low voltage power grid, offset to the distribution transformer (load center), power supply distance, tortuosity coefficient of path, terminal voltage drop, length of single-phase power supply line, length/ section of meter backline, etc. are all indicators to be considered. Moreover, we should not only ensure scientificity and rationality of the low voltage power grid construction design scheme, but also apply informatization means and intelligent software to improve accuracy of design and efficiency of construction.\",\"PeriodicalId\":447871,\"journal\":{\"name\":\"2022 5th International Conference on Power and Energy Applications (ICPEA)\",\"volume\":\"24 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-11-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2022 5th International Conference on Power and Energy Applications (ICPEA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPEA56363.2022.10052476\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2022 5th International Conference on Power and Energy Applications (ICPEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPEA56363.2022.10052476","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

低压电网作为整个配电网的末端,还存在着许多不足和问题,需要进一步加强和解决。在低压电网的规划设计中,对配电变压器(负荷中心)的偏移量、供电距离、路径扭曲系数、终端压降、单相供电线路长度、仪表背线长度/截面等都是需要考虑的指标。不仅要保证低压电网建设设计方案的科学性和合理性,还要运用信息化手段和智能化软件,提高设计的准确性和施工的效率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Design and Engineering Application of Low Voltage Power Grid
As the end of the whole distribution network, low voltage power grid still has many deficiencies and problems that need to be further strengthened and solved. In the planning and design of low voltage power grid, offset to the distribution transformer (load center), power supply distance, tortuosity coefficient of path, terminal voltage drop, length of single-phase power supply line, length/ section of meter backline, etc. are all indicators to be considered. Moreover, we should not only ensure scientificity and rationality of the low voltage power grid construction design scheme, but also apply informatization means and intelligent software to improve accuracy of design and efficiency of construction.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信