{"title":"基于仿真的钢铁厂多阶段流水车间设计方法","authors":"N. Ueno, S. Sotojima, J. Takeda","doi":"10.1145/106073.306884","DOIUrl":null,"url":null,"abstract":"This paper describes a new simulation-based approach for redesign of a multi-stage flow-shop production line. A performance measure which represents an 'actual' production rate of a machine is defined in order to identify bottlenecks. A simulation procedure based on the proposed measure is developed in order to determine how best to alleviate the bottlenecks. This new approach is applied for redesigning an actual large-scale multi-stage flow-shop production line in the authors' steelworks and they can determine the proper specifications of this line which can achieve an increase of productivity with a minimal investment. This approach is practical and powerful for redesign of a multi-stage flow-shop production line. >","PeriodicalId":186490,"journal":{"name":"Annual Simulation Symposium","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1991-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Simulation-based approach to design a multi-stage flow-shop in steel works\",\"authors\":\"N. Ueno, S. Sotojima, J. Takeda\",\"doi\":\"10.1145/106073.306884\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes a new simulation-based approach for redesign of a multi-stage flow-shop production line. A performance measure which represents an 'actual' production rate of a machine is defined in order to identify bottlenecks. A simulation procedure based on the proposed measure is developed in order to determine how best to alleviate the bottlenecks. This new approach is applied for redesigning an actual large-scale multi-stage flow-shop production line in the authors' steelworks and they can determine the proper specifications of this line which can achieve an increase of productivity with a minimal investment. This approach is practical and powerful for redesign of a multi-stage flow-shop production line. >\",\"PeriodicalId\":186490,\"journal\":{\"name\":\"Annual Simulation Symposium\",\"volume\":\"2 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1991-04-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Annual Simulation Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1145/106073.306884\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annual Simulation Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/106073.306884","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Simulation-based approach to design a multi-stage flow-shop in steel works
This paper describes a new simulation-based approach for redesign of a multi-stage flow-shop production line. A performance measure which represents an 'actual' production rate of a machine is defined in order to identify bottlenecks. A simulation procedure based on the proposed measure is developed in order to determine how best to alleviate the bottlenecks. This new approach is applied for redesigning an actual large-scale multi-stage flow-shop production line in the authors' steelworks and they can determine the proper specifications of this line which can achieve an increase of productivity with a minimal investment. This approach is practical and powerful for redesign of a multi-stage flow-shop production line. >