{"title":"应用决策支持指标进行有效的风险知情资产管理","authors":"J. Liming","doi":"10.1109/RAMS.2004.1285515","DOIUrl":null,"url":null,"abstract":"Application of the risk-informed asset management (RIAM) method and associated decision support metrics described herein provides rigorous, systematic, prudent decision-making support for proposed changes to plant equipment and associated operation and maintenance practices and policies at commercial nuclear power plants. A concept for preparing and implementing RIAM programs for power stations and generating companies has been presented herein. The primary figures-of-merit for change are profitability and safety whereby profitability is optimized within the constraints defined by recommended safety limits. The RIAM process presented uses a three-tier screening concept in conjunction with a plant availability model and safety model (event frequency modeling) to help efficiently and accurately identify profitable changes and to quantify impacts on safety. Because plant (or fleet) change decisions are generally associated with a high degree of uncertainty. The RIAM method presented includes uncertainty quantification to aid decision-makers in making decisions for favorable outcomes.","PeriodicalId":270494,"journal":{"name":"Annual Symposium Reliability and Maintainability, 2004 - RAMS","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-08-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Application of decision support metrics for effective risk-informed asset management\",\"authors\":\"J. Liming\",\"doi\":\"10.1109/RAMS.2004.1285515\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Application of the risk-informed asset management (RIAM) method and associated decision support metrics described herein provides rigorous, systematic, prudent decision-making support for proposed changes to plant equipment and associated operation and maintenance practices and policies at commercial nuclear power plants. A concept for preparing and implementing RIAM programs for power stations and generating companies has been presented herein. The primary figures-of-merit for change are profitability and safety whereby profitability is optimized within the constraints defined by recommended safety limits. The RIAM process presented uses a three-tier screening concept in conjunction with a plant availability model and safety model (event frequency modeling) to help efficiently and accurately identify profitable changes and to quantify impacts on safety. Because plant (or fleet) change decisions are generally associated with a high degree of uncertainty. The RIAM method presented includes uncertainty quantification to aid decision-makers in making decisions for favorable outcomes.\",\"PeriodicalId\":270494,\"journal\":{\"name\":\"Annual Symposium Reliability and Maintainability, 2004 - RAMS\",\"volume\":\"31 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2004-08-24\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Annual Symposium Reliability and Maintainability, 2004 - RAMS\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/RAMS.2004.1285515\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Annual Symposium Reliability and Maintainability, 2004 - RAMS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RAMS.2004.1285515","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文所述的风险知情资产管理(RIAM)方法和相关决策支持指标的应用,为拟议中的工厂设备变更以及相关的运营和维护实践和政策提供了严格、系统、审慎的决策支持。本文提出了为发电站和发电公司准备和实施RIAM方案的概念。变更的主要优点是盈利能力和安全性,因此盈利能力在由推荐的安全限制定义的约束中得到优化。RIAM流程采用三层筛选概念,结合工厂可用性模型和安全模型(事件频率建模),帮助高效准确地识别有利可图的变化,并量化对安全的影响。因为工厂(或车队)的变更决策通常与高度的不确定性有关。提出的RIAM方法包括不确定性量化,以帮助决策者做出有利结果的决策。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Application of decision support metrics for effective risk-informed asset management
Application of the risk-informed asset management (RIAM) method and associated decision support metrics described herein provides rigorous, systematic, prudent decision-making support for proposed changes to plant equipment and associated operation and maintenance practices and policies at commercial nuclear power plants. A concept for preparing and implementing RIAM programs for power stations and generating companies has been presented herein. The primary figures-of-merit for change are profitability and safety whereby profitability is optimized within the constraints defined by recommended safety limits. The RIAM process presented uses a three-tier screening concept in conjunction with a plant availability model and safety model (event frequency modeling) to help efficiently and accurately identify profitable changes and to quantify impacts on safety. Because plant (or fleet) change decisions are generally associated with a high degree of uncertainty. The RIAM method presented includes uncertainty quantification to aid decision-makers in making decisions for favorable outcomes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信