舰载电力恢复正常运行

S. Srivastava, K. Butler-Purry, N. Sarma
{"title":"舰载电力恢复正常运行","authors":"S. Srivastava, K. Butler-Purry, N. Sarma","doi":"10.1109/MCAP.2002.1018818","DOIUrl":null,"url":null,"abstract":"Network reconfiguration for restoration in a military shipboard power system is a very important task that is performed in order to restore loads as a result of battle damage or system faults. This article features an expert-system-based reconfiguration methodology for load restoration in shipboard power systems. The power system considered in the present study is based on the layout profile of a US surface combatant ship. The methodology developed will determine whether the loads that lost supply are restorable. When considering loads, it gives precedence to high priority loads. It also determines if there is any violation of current constraints of any cables and voltage constraints at load nodes. If the load is restorable, as suggested by an expert system, and there is no violation of any constraints, then the load is said to be restorable and the operation sequence required in restoring that load would be given as the output. A CAD drawing of the power system and a database of the system information has been developed using a geographic information system (GIS). A software tool incorporating failure assessment and expert system restoration methodology was developed using Visual C++, Multilogic Exsys Developer, Alternate Transients Program (ATP), and Microsoft Access. Microstation has been used for GIS. Various fault cases were designed, and the developed tool was used to run them and perform expert system restoration.","PeriodicalId":435675,"journal":{"name":"IEEE Computer Applications in Power","volume":"119 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2002-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"41","resultStr":"{\"title\":\"Shipboard power restored for active duty\",\"authors\":\"S. Srivastava, K. Butler-Purry, N. Sarma\",\"doi\":\"10.1109/MCAP.2002.1018818\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Network reconfiguration for restoration in a military shipboard power system is a very important task that is performed in order to restore loads as a result of battle damage or system faults. This article features an expert-system-based reconfiguration methodology for load restoration in shipboard power systems. The power system considered in the present study is based on the layout profile of a US surface combatant ship. The methodology developed will determine whether the loads that lost supply are restorable. When considering loads, it gives precedence to high priority loads. It also determines if there is any violation of current constraints of any cables and voltage constraints at load nodes. If the load is restorable, as suggested by an expert system, and there is no violation of any constraints, then the load is said to be restorable and the operation sequence required in restoring that load would be given as the output. A CAD drawing of the power system and a database of the system information has been developed using a geographic information system (GIS). A software tool incorporating failure assessment and expert system restoration methodology was developed using Visual C++, Multilogic Exsys Developer, Alternate Transients Program (ATP), and Microsoft Access. Microstation has been used for GIS. Various fault cases were designed, and the developed tool was used to run them and perform expert system restoration.\",\"PeriodicalId\":435675,\"journal\":{\"name\":\"IEEE Computer Applications in Power\",\"volume\":\"119 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2002-08-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"41\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Computer Applications in Power\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MCAP.2002.1018818\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Computer Applications in Power","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MCAP.2002.1018818","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 41

摘要

军用舰船电力系统的网络重构恢复是一项非常重要的任务,它是为了恢复由于作战损伤或系统故障而造成的负荷。本文提出了一种基于专家系统的船舶电力系统负荷恢复重构方法。在本研究中考虑的动力系统是基于美国水面作战舰艇的布局剖面。所开发的方法将确定失去供应的负载是否可以恢复。在考虑负载时,它优先考虑高优先级的负载。它还确定负载节点上是否存在违反任何电缆的电流约束和电压约束的情况。如果负载是可恢复的,如专家系统所建议的那样,并且没有违反任何约束,则称负载是可恢复的,并将恢复该负载所需的操作顺序作为输出。利用地理信息系统(GIS)建立了电力系统的CAD图和系统信息数据库。采用Visual c++、Multilogic Exsys Developer、Alternate Transients Program (ATP)和Microsoft Access开发了一个集成故障评估和专家系统恢复方法的软件工具。微站已被用于地理信息系统。设计了各种故障案例,并利用开发的工具对其进行了运行和专家系统恢复。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Shipboard power restored for active duty
Network reconfiguration for restoration in a military shipboard power system is a very important task that is performed in order to restore loads as a result of battle damage or system faults. This article features an expert-system-based reconfiguration methodology for load restoration in shipboard power systems. The power system considered in the present study is based on the layout profile of a US surface combatant ship. The methodology developed will determine whether the loads that lost supply are restorable. When considering loads, it gives precedence to high priority loads. It also determines if there is any violation of current constraints of any cables and voltage constraints at load nodes. If the load is restorable, as suggested by an expert system, and there is no violation of any constraints, then the load is said to be restorable and the operation sequence required in restoring that load would be given as the output. A CAD drawing of the power system and a database of the system information has been developed using a geographic information system (GIS). A software tool incorporating failure assessment and expert system restoration methodology was developed using Visual C++, Multilogic Exsys Developer, Alternate Transients Program (ATP), and Microsoft Access. Microstation has been used for GIS. Various fault cases were designed, and the developed tool was used to run them and perform expert system restoration.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信