Takahiro Kataoka, Kazuki Aoyama, N. Maekawa, Yusuke Yamamoto, Masayuki Naito, K. Tatsuno
{"title":"配电维护机器人系统的实验——选择参数为配电维护机器人系统插入螺栓","authors":"Takahiro Kataoka, Kazuki Aoyama, N. Maekawa, Yusuke Yamamoto, Masayuki Naito, K. Tatsuno","doi":"10.1109/MHS.2011.6102205","DOIUrl":null,"url":null,"abstract":"This paper describes how to insert a bolt in power distribution maintenance tasks. The present system has about 1 cm margin error between CG (computer graphic) and real environment. The arm holding the bolt approaches to the position above a bolt hole under position control and inserts the bolt under compliance control.","PeriodicalId":286457,"journal":{"name":"2011 International Symposium on Micro-NanoMechatronics and Human Science","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Experiments on power distribution maintenance robot system-Select parameter to insert a bolt on power distribution maintenance robot system\",\"authors\":\"Takahiro Kataoka, Kazuki Aoyama, N. Maekawa, Yusuke Yamamoto, Masayuki Naito, K. Tatsuno\",\"doi\":\"10.1109/MHS.2011.6102205\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper describes how to insert a bolt in power distribution maintenance tasks. The present system has about 1 cm margin error between CG (computer graphic) and real environment. The arm holding the bolt approaches to the position above a bolt hole under position control and inserts the bolt under compliance control.\",\"PeriodicalId\":286457,\"journal\":{\"name\":\"2011 International Symposium on Micro-NanoMechatronics and Human Science\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2011-12-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2011 International Symposium on Micro-NanoMechatronics and Human Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/MHS.2011.6102205\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 International Symposium on Micro-NanoMechatronics and Human Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/MHS.2011.6102205","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Experiments on power distribution maintenance robot system-Select parameter to insert a bolt on power distribution maintenance robot system
This paper describes how to insert a bolt in power distribution maintenance tasks. The present system has about 1 cm margin error between CG (computer graphic) and real environment. The arm holding the bolt approaches to the position above a bolt hole under position control and inserts the bolt under compliance control.