对干法装置的改进:Matozinhos厂- cncp - mg -巴西

F. J. P. Leme, T. Neto
{"title":"对干法装置的改进:Matozinhos厂- cncp - mg -巴西","authors":"F. J. P. Leme, T. Neto","doi":"10.1109/CITCON.1990.111061","DOIUrl":null,"url":null,"abstract":"Various improvements made to the dry process unit of a Brazilian cement plant are discussed. Details are presented for each of the five modification stages. In each case the results are briefly assessed and costs given.<<ETX>>","PeriodicalId":339195,"journal":{"name":"IEEE Technical Conference on cement Industry","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1990-05-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Improvement on the dry process unit: Matozinhos plant-C.N.C.P.-M.G-Brazil\",\"authors\":\"F. J. P. Leme, T. Neto\",\"doi\":\"10.1109/CITCON.1990.111061\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Various improvements made to the dry process unit of a Brazilian cement plant are discussed. Details are presented for each of the five modification stages. In each case the results are briefly assessed and costs given.<<ETX>>\",\"PeriodicalId\":339195,\"journal\":{\"name\":\"IEEE Technical Conference on cement Industry\",\"volume\":\"17 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1990-05-22\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Technical Conference on cement Industry\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CITCON.1990.111061\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Technical Conference on cement Industry","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITCON.1990.111061","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

论述了对巴西某水泥厂干法装置所作的各种改进。详细介绍了五个修改阶段。在每种情况下,都简要评估了结果并给出了成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Improvement on the dry process unit: Matozinhos plant-C.N.C.P.-M.G-Brazil
Various improvements made to the dry process unit of a Brazilian cement plant are discussed. Details are presented for each of the five modification stages. In each case the results are briefly assessed and costs given.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信