广州地铁EPC模式投资控制关键问题研究——以广州地铁18/22号线为例

Qian Zhang
{"title":"广州地铁EPC模式投资控制关键问题研究——以广州地铁18/22号线为例","authors":"Qian Zhang","doi":"10.2991/BEMS-19.2019.74","DOIUrl":null,"url":null,"abstract":"The development of the city is often accompanied by the construction of infrastructure. Various models also impact the Chinese construction market. As a kind of contracting and forwarding model, EPC has a positive effect on improving the level of engineering construction, so it is gradually applied and implemented extensively in China. However, there may be problems with the project getting out of control during the operation. Guangzhou Metro Line 18/22 is piloted by this model. This paper uses the method of research on the contract terms of Guangzhou Metro Line 18/22 to analyze the project control rights allocation, contract risk sharing and flexible clauses. To identify the key elements of investment management and control of the Guangzhou Metro 18/22 line project, and to enhance the success of the metro project construction management under this mode by strengthening the investment control of the owner under the EPC model.","PeriodicalId":371455,"journal":{"name":"Proceedings of the 1st International Conference on Business, Economics, Management Science (BEMS 2019)","volume":"65 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on Key Issues Related to Investment Control in Guangzhou Metro EPC Mode -- Taking the 18/22 line of Guangzhou Metro as an example\",\"authors\":\"Qian Zhang\",\"doi\":\"10.2991/BEMS-19.2019.74\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The development of the city is often accompanied by the construction of infrastructure. Various models also impact the Chinese construction market. As a kind of contracting and forwarding model, EPC has a positive effect on improving the level of engineering construction, so it is gradually applied and implemented extensively in China. However, there may be problems with the project getting out of control during the operation. Guangzhou Metro Line 18/22 is piloted by this model. This paper uses the method of research on the contract terms of Guangzhou Metro Line 18/22 to analyze the project control rights allocation, contract risk sharing and flexible clauses. To identify the key elements of investment management and control of the Guangzhou Metro 18/22 line project, and to enhance the success of the metro project construction management under this mode by strengthening the investment control of the owner under the EPC model.\",\"PeriodicalId\":371455,\"journal\":{\"name\":\"Proceedings of the 1st International Conference on Business, Economics, Management Science (BEMS 2019)\",\"volume\":\"65 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-05-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Proceedings of the 1st International Conference on Business, Economics, Management Science (BEMS 2019)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2991/BEMS-19.2019.74\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings of the 1st International Conference on Business, Economics, Management Science (BEMS 2019)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2991/BEMS-19.2019.74","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

城市的发展往往伴随着基础设施的建设。各种模式也影响着中国建筑市场。EPC作为一种承包转发模式,对提高工程建设水平具有积极的作用,因此在中国逐渐得到广泛的应用和实施。但是,在运行过程中可能会出现项目失控的问题。广州地铁18/22号线就采用了这种模式。本文以广州地铁18/22号线合同条款为研究对象,对项目控制权分配、合同风险分担和弹性条款进行了分析。找出广州地铁18/22号线项目投资管控的关键要素,通过加强EPC模式下业主的投资管控,提升该模式下地铁项目建设管理的成功度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on Key Issues Related to Investment Control in Guangzhou Metro EPC Mode -- Taking the 18/22 line of Guangzhou Metro as an example
The development of the city is often accompanied by the construction of infrastructure. Various models also impact the Chinese construction market. As a kind of contracting and forwarding model, EPC has a positive effect on improving the level of engineering construction, so it is gradually applied and implemented extensively in China. However, there may be problems with the project getting out of control during the operation. Guangzhou Metro Line 18/22 is piloted by this model. This paper uses the method of research on the contract terms of Guangzhou Metro Line 18/22 to analyze the project control rights allocation, contract risk sharing and flexible clauses. To identify the key elements of investment management and control of the Guangzhou Metro 18/22 line project, and to enhance the success of the metro project construction management under this mode by strengthening the investment control of the owner under the EPC model.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信