哨兵- 1a LEOP和调试

R. Torres, Svein Lokas, D. Geudtner, B. Rosich
{"title":"哨兵- 1a LEOP和调试","authors":"R. Torres, Svein Lokas, D. Geudtner, B. Rosich","doi":"10.1109/IGARSS.2014.6946714","DOIUrl":null,"url":null,"abstract":"Sentinel-1A, the first component of the Copernicus Space Segment developed by the European Space Agency, has been launched 3 April 2014. The LEOP Phase is expected to last three days where all subsystems and the SAR instrument will be checked. It is immediately followed by the three-month Commissioning Phase that will include the in-orbit Calibration and Characterisation, and the verification of the satellite, in order to deliver a full functional and well performing satellite to the mission operations. This paper will present the LEOP and Commissioning activities in progress, and the status of Calibration, Characterisation and Verification activities of the Commissioning in place.","PeriodicalId":385645,"journal":{"name":"2014 IEEE Geoscience and Remote Sensing Symposium","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2016-07-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":"{\"title\":\"Sentinel-1A LEOP and commissioning\",\"authors\":\"R. Torres, Svein Lokas, D. Geudtner, B. Rosich\",\"doi\":\"10.1109/IGARSS.2014.6946714\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Sentinel-1A, the first component of the Copernicus Space Segment developed by the European Space Agency, has been launched 3 April 2014. The LEOP Phase is expected to last three days where all subsystems and the SAR instrument will be checked. It is immediately followed by the three-month Commissioning Phase that will include the in-orbit Calibration and Characterisation, and the verification of the satellite, in order to deliver a full functional and well performing satellite to the mission operations. This paper will present the LEOP and Commissioning activities in progress, and the status of Calibration, Characterisation and Verification activities of the Commissioning in place.\",\"PeriodicalId\":385645,\"journal\":{\"name\":\"2014 IEEE Geoscience and Remote Sensing Symposium\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2016-07-10\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"4\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE Geoscience and Remote Sensing Symposium\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IGARSS.2014.6946714\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE Geoscience and Remote Sensing Symposium","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IGARSS.2014.6946714","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

摘要

哨兵- 1a是欧洲航天局开发的哥白尼空间段的第一个组成部分,已于2014年4月3日发射。LEOP阶段预计将持续三天,所有子系统和SAR仪器将被检查。紧随其后的是为期三个月的调试阶段,其中包括在轨校准和表征,以及卫星的验证,以便为任务操作提供一颗功能齐全、性能良好的卫星。本文将介绍正在进行的LEOP和试运行活动,以及试运行的校准、表征和验证活动的状态。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Sentinel-1A LEOP and commissioning
Sentinel-1A, the first component of the Copernicus Space Segment developed by the European Space Agency, has been launched 3 April 2014. The LEOP Phase is expected to last three days where all subsystems and the SAR instrument will be checked. It is immediately followed by the three-month Commissioning Phase that will include the in-orbit Calibration and Characterisation, and the verification of the satellite, in order to deliver a full functional and well performing satellite to the mission operations. This paper will present the LEOP and Commissioning activities in progress, and the status of Calibration, Characterisation and Verification activities of the Commissioning in place.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信