新的探地雷达监管环境

G. Olhoeft
{"title":"新的探地雷达监管环境","authors":"G. Olhoeft","doi":"10.1117/12.462238","DOIUrl":null,"url":null,"abstract":"By its very nature, ground penetrating radar (GPR) is an ultra-wideband device (UWB), requiring a large range in frequency to penetrate the ground and image with sufficient resolution to solve practical problems. The increasing scarcity of electromagnetic spectrum and the proposed use of other UWB devices in 1998 caused the U.S. Federal Communications Commission (FCC) to initiate an inquiry (NOI ET Docket 98-153) to investigate permitting the operation of ultra-wideband devices (including ground penetrating radar) on an unlicensed basis under Part 15 of the FCC rules. Through 14 February 2002, the FCC had received over 910 comments in the inquiry (NOI 98-153) and on the Notice of Proposed Rulemaking (NPRM 00-163) issued in June, 2000. The First Report and Order (R&O 02-48) was issued on 14 February 2002. Before this, ground penetrating radar use was only officially permitted for those who had received waivers from the FCC or NTIA (National Telecommunications and Information Administration), who jointly regulate radio spectrum use in the United States. Legal waivers to manufacture ground penetrating radar were issued to U.S. Radar Inc., Time Domain Inc. and Zircon Corp. in June, 1999, and expiring with the R&O. Waivers to build or use ground penetrating radar were issued to the U. S. Geological Survey, U. S. Army and U. S. DOE by NTIA (or predecessors) from about 1976. The R&O issued on 14 February 2002 ...provides for the operation of GPRs and other imaging devices under Part 15 of the Commission's rules subject to certain frequency and power limitations. The operators of imaging devices must be eligible for licensing under Part 90 of our rules... At the request of NTIA, the FCC will notify or coordinate with NTIA prior to the operation of all imaging systems. GPRs must be operated below 960 MHz or in the frequency band 3.1-10.6 GHz. The FCC ...intends within the next six to twelve months to review the standards for UWB devices and issue a further notice of proposed rule making to explore more flexible standards and address the operation of additional types of UWB operations and technology. This FCC rule impacts ground penetrating radar manufacture, sale and use in the United States (and in other countries whose rules are linked to FCC regulations).","PeriodicalId":256772,"journal":{"name":"International Conference on Ground Penetrating Radar","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2002-04-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":"{\"title\":\"The new ground-penetrating radar regulatory environment\",\"authors\":\"G. Olhoeft\",\"doi\":\"10.1117/12.462238\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"By its very nature, ground penetrating radar (GPR) is an ultra-wideband device (UWB), requiring a large range in frequency to penetrate the ground and image with sufficient resolution to solve practical problems. The increasing scarcity of electromagnetic spectrum and the proposed use of other UWB devices in 1998 caused the U.S. Federal Communications Commission (FCC) to initiate an inquiry (NOI ET Docket 98-153) to investigate permitting the operation of ultra-wideband devices (including ground penetrating radar) on an unlicensed basis under Part 15 of the FCC rules. Through 14 February 2002, the FCC had received over 910 comments in the inquiry (NOI 98-153) and on the Notice of Proposed Rulemaking (NPRM 00-163) issued in June, 2000. The First Report and Order (R&O 02-48) was issued on 14 February 2002. Before this, ground penetrating radar use was only officially permitted for those who had received waivers from the FCC or NTIA (National Telecommunications and Information Administration), who jointly regulate radio spectrum use in the United States. Legal waivers to manufacture ground penetrating radar were issued to U.S. Radar Inc., Time Domain Inc. and Zircon Corp. in June, 1999, and expiring with the R&O. Waivers to build or use ground penetrating radar were issued to the U. S. Geological Survey, U. S. Army and U. S. DOE by NTIA (or predecessors) from about 1976. The R&O issued on 14 February 2002 ...provides for the operation of GPRs and other imaging devices under Part 15 of the Commission's rules subject to certain frequency and power limitations. The operators of imaging devices must be eligible for licensing under Part 90 of our rules... At the request of NTIA, the FCC will notify or coordinate with NTIA prior to the operation of all imaging systems. GPRs must be operated below 960 MHz or in the frequency band 3.1-10.6 GHz. The FCC ...intends within the next six to twelve months to review the standards for UWB devices and issue a further notice of proposed rule making to explore more flexible standards and address the operation of additional types of UWB operations and technology. This FCC rule impacts ground penetrating radar manufacture, sale and use in the United States (and in other countries whose rules are linked to FCC regulations).\",\"PeriodicalId\":256772,\"journal\":{\"name\":\"International Conference on Ground Penetrating Radar\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2002-04-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"8\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Conference on Ground Penetrating Radar\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1117/12.462238\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Conference on Ground Penetrating Radar","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1117/12.462238","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8

摘要

探地雷达(GPR)本质上是一种超宽带设备(UWB),需要在较大的频率范围内穿透地面,并以足够的分辨率成像以解决实际问题。1998年,由于电磁频谱的日益稀缺和其他超宽带设备的建议使用,美国联邦通信委员会(FCC)发起了一项调查(NOI ET Docket 98-153),以调查根据FCC规则第15部分允许在未经许可的基础上运行超宽带设备(包括探地雷达)。截至2002年2月14日,FCC收到了超过910条关于调查(NOI 98-153)和2000年6月发布的拟议规则制定通知(NPRM 00-163)的评论。第一次报告及命令(R&O 02-48)已于2002年2月14日发出。在此之前,只有那些从FCC或NTIA(国家电信和信息管理局)获得豁免的人才正式允许使用探地雷达,这两个机构联合管理美国的无线电频谱使用。1999年6月,美国雷达公司、时域公司和锆石公司获得了制造探地雷达的合法豁免,并在R&O到期。大约从1976年开始,NTIA(或其前身)向美国地质调查局、美国陆军和美国能源部发布了建造或使用探地雷达的豁免。在2002年2月14日发出的R&O…为根据委员会规则第15部操作的GPRs及其他成像装置提供条文,但须受某些频率及功率限制。成像设备的操作员必须符合我们规则第90部分的许可资格……应NTIA的要求,FCC将在所有成像系统运行之前通知NTIA或与NTIA协调。GPRs必须工作在960mhz以下或3.1-10.6 GHz频段。FCC…打算在未来6到12个月内审查UWB设备的标准,并发布进一步的规则制定通知,以探索更灵活的标准,并解决其他类型的UWB操作和技术的操作。本FCC规则影响探地雷达在美国(以及其他规则与FCC法规相关的国家)的制造、销售和使用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The new ground-penetrating radar regulatory environment
By its very nature, ground penetrating radar (GPR) is an ultra-wideband device (UWB), requiring a large range in frequency to penetrate the ground and image with sufficient resolution to solve practical problems. The increasing scarcity of electromagnetic spectrum and the proposed use of other UWB devices in 1998 caused the U.S. Federal Communications Commission (FCC) to initiate an inquiry (NOI ET Docket 98-153) to investigate permitting the operation of ultra-wideband devices (including ground penetrating radar) on an unlicensed basis under Part 15 of the FCC rules. Through 14 February 2002, the FCC had received over 910 comments in the inquiry (NOI 98-153) and on the Notice of Proposed Rulemaking (NPRM 00-163) issued in June, 2000. The First Report and Order (R&O 02-48) was issued on 14 February 2002. Before this, ground penetrating radar use was only officially permitted for those who had received waivers from the FCC or NTIA (National Telecommunications and Information Administration), who jointly regulate radio spectrum use in the United States. Legal waivers to manufacture ground penetrating radar were issued to U.S. Radar Inc., Time Domain Inc. and Zircon Corp. in June, 1999, and expiring with the R&O. Waivers to build or use ground penetrating radar were issued to the U. S. Geological Survey, U. S. Army and U. S. DOE by NTIA (or predecessors) from about 1976. The R&O issued on 14 February 2002 ...provides for the operation of GPRs and other imaging devices under Part 15 of the Commission's rules subject to certain frequency and power limitations. The operators of imaging devices must be eligible for licensing under Part 90 of our rules... At the request of NTIA, the FCC will notify or coordinate with NTIA prior to the operation of all imaging systems. GPRs must be operated below 960 MHz or in the frequency band 3.1-10.6 GHz. The FCC ...intends within the next six to twelve months to review the standards for UWB devices and issue a further notice of proposed rule making to explore more flexible standards and address the operation of additional types of UWB operations and technology. This FCC rule impacts ground penetrating radar manufacture, sale and use in the United States (and in other countries whose rules are linked to FCC regulations).
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信