{"title":"基于随机负荷生成的农村微电网两阶段随机扩容","authors":"N. Stevanato, F. Lombardi, Emanuela Colmbo, S. Balderrama, S. Quoilin","doi":"10.1109/PTC.2019.8810571","DOIUrl":null,"url":null,"abstract":"Robust sizing of rural micro-grids is hindered by uncertainty associated with the expected load demand and its potential evolution over time. This study couples a stochastic load generation model with a two-stage stochastic micro-grid sizing model to take into account multiple probabilistic load scenarios within a single optimisation problem. As a result, the stochastic-optimal sizing of the system ensures an increased robustness to shocks in the expected load compared to a best-case (lowest-demand) sizing, though with a lower cost and better dispatch flexibility compared to a worst-case (highest-demand) sizing. What is more, allowing just a 1% unmet demand enables to significantly improve the cost-competitiveness and the renewables penetration as all the not supplied energy is located in a negligible fraction of the unlikeliest highest demand scenarios.","PeriodicalId":187144,"journal":{"name":"2019 IEEE Milan PowerTech","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":"{\"title\":\"Two-Stage Stochastic Sizing of a Rural Micro-Grid Based on Stochastic Load Generation\",\"authors\":\"N. Stevanato, F. Lombardi, Emanuela Colmbo, S. Balderrama, S. Quoilin\",\"doi\":\"10.1109/PTC.2019.8810571\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Robust sizing of rural micro-grids is hindered by uncertainty associated with the expected load demand and its potential evolution over time. This study couples a stochastic load generation model with a two-stage stochastic micro-grid sizing model to take into account multiple probabilistic load scenarios within a single optimisation problem. As a result, the stochastic-optimal sizing of the system ensures an increased robustness to shocks in the expected load compared to a best-case (lowest-demand) sizing, though with a lower cost and better dispatch flexibility compared to a worst-case (highest-demand) sizing. What is more, allowing just a 1% unmet demand enables to significantly improve the cost-competitiveness and the renewables penetration as all the not supplied energy is located in a negligible fraction of the unlikeliest highest demand scenarios.\",\"PeriodicalId\":187144,\"journal\":{\"name\":\"2019 IEEE Milan PowerTech\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2019-06-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"14\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2019 IEEE Milan PowerTech\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PTC.2019.8810571\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 IEEE Milan PowerTech","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PTC.2019.8810571","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Two-Stage Stochastic Sizing of a Rural Micro-Grid Based on Stochastic Load Generation
Robust sizing of rural micro-grids is hindered by uncertainty associated with the expected load demand and its potential evolution over time. This study couples a stochastic load generation model with a two-stage stochastic micro-grid sizing model to take into account multiple probabilistic load scenarios within a single optimisation problem. As a result, the stochastic-optimal sizing of the system ensures an increased robustness to shocks in the expected load compared to a best-case (lowest-demand) sizing, though with a lower cost and better dispatch flexibility compared to a worst-case (highest-demand) sizing. What is more, allowing just a 1% unmet demand enables to significantly improve the cost-competitiveness and the renewables penetration as all the not supplied energy is located in a negligible fraction of the unlikeliest highest demand scenarios.